Laserfiche WebLink
30 January 2014 <br /> AGE Project No . 99-0682 <br /> Page 14 of 28 <br /> approximately 1 , 500 feet southwest of the site . It is unlikely that water in McCleod Lake is <br /> contaminated by impacted groundwater from the site based on its distance and direction <br /> (up-gradient) from the site . <br /> 9.0 . HISTORICAL SOIL REMEDIATION - SOIL VAPOR EXTRACTION <br /> Between 14 September 2010 (start-up ) and 22 August 2011 , an SVE remediation system <br /> was operated at the site, utilizing a natural gas-fired , thermal/catalytic oxidizer SVE system <br /> to selectively apply an induced vacuum to wells VW-1 , VW-2 , VW-3 and VW-4. SVE <br /> procedures for the site were described in AGE-prepared Interim Soil Remediation Work <br /> Plan (dated 25 July 2008) and approved by the SJCEHD , by letter dated 25 July 2008 . <br /> Based on influent sampling results , the on-site SVE system removed an estimated <br /> 10 , 201 pounds , equivalent to 1 , 632 gallons of adsorbed petroleum hydrocarbons from the <br /> vadose zone at the site (Tables 6, 7 , and 8) . <br /> On 22 August 2011 the on-site SVE system was temporarily shut down for the <br /> performance of an SVE rebound response test. The system was restarted for a period of <br /> 247hours on 19 October 2011 and subsequently sampled on 20 October 2011 as part of <br /> the SVE rebound test. <br /> Following the 22 August 2011 shut off date, SVE operations were suspended at the site <br /> for a period of 58 days (2-months). Following the 2-month period , the SVE remediation <br /> system was restarted and allowed to operate for a period of 24rfturs to achieve <br /> equilibrium conditions . After the 24-hour operation period , rebound response SVE influent <br /> and effluent air samples were collected . <br /> Results of the SVE rebound response test did not indicate any significant spike in vapor <br /> concentrations had occurred , and generally appeared to be within the range of previously <br /> encountered hydrocarbon concentrations . The SVE system currently remains non- <br /> operational based on results of the pilot test. <br /> 10.0. REMEDIAL FEASIBILITY TESTING - W--SITU CHEMICAL OXIDATION <br /> Between 29-31 May, 04-06 June , 13- 15 June and 18-20 June 2012 , a total of twelve ( 12) <br /> batches of a 5% solution of hydrogen peroxide (approximately 2 ,400 gallons) were <br /> prepared on-site and pressure injected into wells MWAA and MW-8 as part of an in-situ <br /> chemical oxidation ( ISCO) pilot test. procedures for the site were described in AGE- <br /> prepared Interim Soil Remediation Work Plan (dated 25 July 2008) and approved by the <br /> SJCEHD , by letter dated 25 July 2008 . <br /> Advanced GeoEnvironmentay Inc. <br />