My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
602
>
3500 - Local Oversight Program
>
PR0544148
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 6:16:53 PM
Creation date
2/14/2019 2:56:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544148
PE
3526
FACILITY_ID
FA0005937
FACILITY_NAME
NEAL STALLWORTH AUTO DETAIL
STREET_NUMBER
602
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13916509
CURRENT_STATUS
02
SITE_LOCATION
602 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ <br /> N <br /> 30 January 2014 <br /> AGE Project No. 99-0682 <br /> Page 22 of 28 <br /> i <br /> installation of additional shallow and intermediate injection wells and the procedures forthe <br /> proposed corrective action at the site . <br /> SCOPE OF WORK <br /> The scope of the work includes the drilling and installation of four shallow-screened and <br /> five-intermediate screened _bjeclio wells, four tri-weekly rection events using proposed <br /> and existing wells , and progress groundwater monitoring and sampling . The scope of work <br /> will include the following tasks: <br /> Permitting and pre-field work activities; <br /> • Pilot drilling and soil sample collection/laboratory analysis of soil samples; ; <br /> • Injection well installation and development; <br /> • Remediation well installation reporting ; <br /> • Four-Tri-weekly ISCO application events ; <br /> • Progress monitoring events; <br /> • Preparation of remedial progress report. <br /> PERMITTING AND PRE-FIELD WORK ACTIVITIES <br /> Applicable site assessment permits will be obtained from the SJCEHD . In addition , an <br /> update to the health and safety plan presently on-file will be prepared in accordance with <br /> Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities <br /> (National Institute for Occupational Safety and Health Administration , U . S . Coast Guard <br /> and U . S . Environmental Protection Agency, 1985) . Prior to mobilization , each proposed <br /> boring/well locations will be clearly marked and a utility clearance obtained through <br /> Underground Service Alert. <br /> DRILLING AND SAMPLE ANALYSIS <br /> AGE proposes to advance a total of nine pilot soil borings to depths of 45 (total of four) and <br /> 70 (total of five) feet bsg for the installation of a shallow and intermediate injection wells. <br /> Soil borings will be advanced using a truck-mounted drill rig equipped with 8 . 25-inch <br /> hollow-stem augers . The total depth of each well boring may vary according to <br /> geologic/hydrogeologic conditions encountered during drilling . Soil samples will be <br /> Advanced GeoEnvironmental, 1ne, <br />
The URL can be used to link to this page
Your browser does not support the video tag.