My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
602
>
3500 - Local Oversight Program
>
PR0544148
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 6:16:53 PM
Creation date
2/14/2019 2:56:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544148
PE
3526
FACILITY_ID
FA0005937
FACILITY_NAME
NEAL STALLWORTH AUTO DETAIL
STREET_NUMBER
602
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13916509
CURRENT_STATUS
02
SITE_LOCATION
602 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30 January 2014 <br /> AGE Project No. 99-0682 <br /> Page 24 of 28 <br /> during pumping or bailing , and to maximize the efficiency of ISCO injections . As built <br /> diagrams of the proposed designs of the injection wells have been included as Figures 16 <br /> and 17 . <br /> REMEDIATION WELL INSTALLATION REPORT OF FINDINGS <br /> A report documenting the findings of the remedial well installations and development will <br /> be prepared following performance of field work and receipt of all applicable data . The <br /> report will include a description of work performed and the results of sampling and analysis . <br /> Conclusions and recommendations will also be included , if applicable in the report. All <br /> reports will be in a format acceptable to the EHD and CVRWQCB , and will be reviewed <br /> and signed by a California Professional Geologist. <br /> ISCO APPLICATION <br /> Upon regulatory approval , AGE will conduct four initial tri-weekly ISCO applications utilizing <br /> wells MW-1A, MW-1 B , MW-6, MW-7, MW-8 and the nine proposed injection wells. A 5% <br /> solution of hydrogen peroxide will be applied to each well during the proposed four tri- <br /> weekly events. Baseline/background and progress sampling will be performed using wells <br /> MWAA, MW-6, MW-7, MW-8 and MW-10 . Additionally, post-ISCO sampling will be <br /> conducted two months following the performance of the final injection event. Field <br /> parameters and laboratory samples will be collected and analyzed as described below: <br /> Field Parameters : <br /> • Depth to water will be measured in shallow and intermediate groundwater <br /> monitoring wells MWAA, MW-6 , MW-7, MW-8 and MW-10 . <br /> • Prior to each purge volume, temperature , pH , TDS , oxygen reduction potential <br /> (ORP), salinity, turbidity, and dissolved oxygen (DO) will be recorded at the <br /> monitoring wells. <br /> Laboratory Testing : <br /> • Total petroleum hydrocarbons quantified as gasoline and diesel (TPH-g and TPH-d) <br /> by EPA method 8015 modified ; <br /> • Benzene, toluene, ethylbenzene and xylenes (BTEX) by EPA method 8260B ; <br /> • Volatile organic compounds by EPA method 8260B ; <br /> Advanced GeoEnvironmental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.