My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
2315
>
3500 - Local Oversight Program
>
PR0544152
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 8:10:59 PM
Creation date
2/14/2019 4:41:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544152
PE
3528
FACILITY_ID
FA0004062
FACILITY_NAME
VOGUE CLEANERS
STREET_NUMBER
2315
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12538016
CURRENT_STATUS
02
SITE_LOCATION
2315 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chronology <br /> May 2011 <br /> i <br /> Vogue Cleaners RO#: 607 <br /> 2315 N. California Street CUF#:.11775 <br /> Stockton, CA. 95204 Geotracker ID#: T0607700741 <br /> EHD Caseworker: Michael Infurna <br /> I <br /> 06/06/1996 Two underground storage tanks (UST) removed this day under permit <br /> issued by the EHD. Soil below USTs showed dark stains and had <br /> hydrocarbon odors. UST-1 was used to hold Stoddard Solvent (SS) for <br /> use in dry cleaner operations and UST-2 was used to hold gasoline for <br /> delivery truck use. <br /> 06/13/1996 EHD Unit III reviews soil laboratory results. Total petroleum <br /> hydrocarbons as gasoline (TPHg) and SS present at levels that fail <br /> leaching potential. Unauthorized Release Form, "96-U21" and <br /> Proposition 65 Notification # 96-09 filed. <br /> 06/21/1996 Date of"Dirty" letter sent to facility operator, Mr. Nathan Smoot. <br /> 07/01/1996 Date of the EHD Unit IV official Notice of Reimbursement sent to <br /> landowner, Mr. Norman Higgins dvising of site entry into the EHD's <br /> Local Oversight Program (LOP). Site assigned to Linda Turkette, RENS. <br /> 07/30/1996 Date of Phase 1 Site Investigation Work Plan submitted to the EHD to <br /> install soil boring BH-1 and monitoring well, MW-1 in areas of each <br /> former UST pit. <br /> 08/20/1996 Date of the EHD work plan approval letter. <br /> 11/08/1996 Monitoring weli MW-1 installed. <br /> 02/20/1997 Date of Report of Phase 1 Site Monitoring submitted by consultant, <br /> Foothill Engineering (Foothill). <br /> 03/06/1997 Date of the EHD letter commer ting on the soil borings and MW-1 <br /> installation. The EHD required additional monitoring wells and soil <br /> borings to be installed to continue the soil and groundwater plume <br /> delineation investigation <br /> 04/04/1997 Date of the State Water Resourc s Control Board (SWRCB) Clean Up <br /> Fund (CUF) letter of commitment. Site assigned to Michael Infurna. <br /> 10/16/1997 Date of Foothill's work plan to ins all MW-2 and if non-detect, not install <br /> MW-3 and MW-4. <br />
The URL can be used to link to this page
Your browser does not support the video tag.