My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:16:46 AM
Creation date
2/15/2019 8:29:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC H-VALTH SERVIC'tS oP�.�_�N.. <br /> SAN JOAQUIN COUNTY Q <br /> ENVIRONMENTAL HEALTH DIVISION ' <br /> Karen Furst, M.D., M.P.H., Health Officer ., - -P <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br /> 2091468-3420 <br /> PAUL SUPPLE .SUN 3 0 2000 <br /> ARCO PRODUCTS COMPANY <br /> PO BOX 6549 <br /> MORAGA CA 94570 <br /> Re: ARCO Service Station#2186 Site Code: 1035 <br /> 3212 N. California St. <br /> Stockton, CA 95204 <br /> San Joaquin County Public Health Services Environmental Health Division(PHS/EHD)approved"with <br /> conditions"a Work Plan for Well Installation and Feasibility Test dated February 10,2000 prepared by IT <br /> Corporation for the above referenced site. Work was to be completed within 90 days of the Work Plan <br /> approval date, which was March 6,2000. Upon the site consultants request,PHS/EHD extended the 90- <br /> day work completion date to June 30, 2000.The site consultant requested a second extension on June 28, <br /> 2000. <br /> PHS/EHD understands that ARCO performed a well survey in the area around this site. This information <br /> should be submitted to PHSIEHD. Any information in the ARCO well survey that conflicts with the well <br /> survey information presented in the"Work Plan to Further Assess Hydrocarbon Impacted Soil and <br /> Groundwater"dated April 15, 1999 prepared by Pinnacle Environmental Solutions,should be verified, <br /> corrected if necessary,and incorporated into this Work Plan. <br /> Boring and encroachment permit applications with appropriate fees, Work Plan modifications, and <br /> accurate well receptor survey information must be submitted to this office by July 14,2000. <br /> Work must be completed as outlined in the above referenced conditionally approved Work Plan b <br /> August 18 2000. <br /> Please contact Carol Oz, Senior REHS at(209)468-3440 if you have questions regarding this letter. <br /> Donna Heran,REHS,Director <br /> Environmental Health Division <br /> otCarol Oz, Senior REHS Margaret La rio,REHS <br /> Site Mitigation Unit IV Supervisor <br /> cc: Marty Hartzell-CVRWQCB <br /> Jay Johnson-STRATUS <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.