Laserfiche WebLink
Stantec <br /> Work Plan for Vapor ProbeDestruction, Well Destruction, and Well Installation <br /> ARCO Service Station No. 2186 <br /> October 14, 2008 <br /> identify the location of any utilities in the area. USA will be'notified to identify any public utility <br /> alignments that may be in conflict with the proposed borings: In conjunction with the USA, 811 will <br /> be notified at least 48 hours in advance of drilling,to-allow the local underground utility companies to <br /> identify the location of any utilities in the area. The new 811 number is a national"Call Before You <br /> Dig" phone number designated by the FCC to eliminate the confusion of multiple"Call Before You <br /> Dig"numbers. 811 calls will be directed to the local One Call Center and the affected utilities,who <br /> will then mark underground lines. In conjunction with USA and 811; a private utility locating <br /> company will be utilized for clearing proposed soil boring locations for underground utilities'7"w-a' <br /> 2.2 Soil Vapor Probe Destruction <br /> The destruction of soil vapor probes VP-1 through VP-3 ill be supervised by Stratus. A licensed <br /> drilling company will complete the soil.,vapor probed truction work following"thi-e4California Well <br /> Standards bulletin.74.;90 Part Ill,�Section,19 an 23 ,Well constructiondetails are summarized ins <br /> Table 1.and soil boring logs are included as Attac ment �l <br /> .,._. / IIA - A#ria rvE" <br /> Soil vapor probes VP-1 through VP-3 will-be-pressure grouted from total depth to approximately.�hd- <br /> ground"surface using neat cement. Groundwater expelled from the wells during the grouting <br /> process will be.properly contained,.characterized,"and disposed. The former soil vapor probes will-) <br /> be capped with appropHate._material-s to-match existing grade. �"--= �► <br /> - 23 Well.Destruction <br /> The destruction of wells MW-1 and MW-3 will be supervised by Stratus. A licensed drilling company <br /> will complete the well destruction work following the California Well_Standards bulletin 74-90 Part 111, <br /> Section 19 and23. ` .. <br /> Wells MW-1 and MW-3 will be destroyed by-removJJi�ll oft well contents via over-drilling the 35� <br /> boreholes to total depth, the n'backfiIling the.bar€holes to three.ft bgs-with.,neat._cement using'a <br /> treinie-pipe system forming k�-mushroom g ut ca_ rface seal."Groundwater expelled from the <br /> wells during the grouting proces`sWilfib pro ontained, characterized,and disposedof..=After <br /> the sealing operation,the bbreh61bs`shall be backfilled with clean', native soil.71 a formerwehs will <br /> be capped with appropriate materials to matchexi§ting-grade--= <br /> 2.4 Soil Boring,Advaneement, Soil Sampling, and Well Installation <br /> Three on-site soil boring/groundwater monitoring wells- (MW-1 R, MW-1 D, and MW-3R) are <br /> proposed at the approximate locations shown on Figure 2. The locations of the proposed wells may <br /> require field modification due to unforeseen conditions such as obstructions or space constraints to <br /> accommodate drilling equipment placement, etc. <br /> Prior to drilling, all locations will be air-knifed to-al l"five ft bgs: The-soil borings for.MW_1.R.and <br /> MW-3R,will be advanced to approximately ft.bg"s_using a drill rig equipped,with-ieight-inch <br /> diameter,continuous flight, hollow-stem auger ..th soil boring for-MW-1 D.will.initially be advanced_ <br /> to approximately 65 ft bgs using a drill rig equipped with.an eight-inch.diameter,continuous flight, ' <br /> hollow-stent auger as'a pilot hole:Afterward,the soil_boring will be advanced to a depth of 65 ft bgs <br /> using a drill-rig equipped with-an 18-inch diameter-,continuous flight,hollow-stem auger centered on'' <br /> the.eight-inch-pilot hole. An eight an 518 inch diameter, lush-threaded,steel conductor casing will <br /> - 7 <br /> 2186 Work Plan for Vapor Probe Destruction, Well Destruction, and Well Installation.doc 3 <br />