My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:30:44 AM
Creation date
2/15/2019 8:37:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> Work Plan for Vapor ProbeDestruction, Well Destruction;and Well Installation <br /> ARCO Service Station No.2186 <br /> October 14,2008 <br /> be set within the annulus of the auger.Jhe annulac-space between the:inner diameter of the auger <br /> and the outerdiameter of the conductor casing will be filled with neat cement and/or grout via tremae 4 <br /> pipe from total depth to`12-inches from the surface. ;The grout will be given.at least -116' rt toxo <br /> cure, after which, a drill rig equipped with an eight-inch:diameter, continuous flight, hollow-stem <br /> f auger will be used to advance MW71 D from 65 ft bgs to 85 ft bgs down the inside of the conductor <br /> _ _ <br /> casing. . _� �. .,.:. .. s � �-w._ <br /> During advancement, soil samples will be collected at-five-foot intervals using a--steel-.-split-spoon <br /> sampler driven approximately 24:inches using a 140-Ib hammer that is dropped 30'inches.-Ari <br /> attending geologist will log cuttings and sample in accordance with American Society for Testing and <br /> Materials (ASTM) D-2488 —.Standard Practice for.Description and'Identification�of Soils Manual <br /> l- <br /> Manual Procedure) under the direction'of a State of"California 'Professi a['Geologist or <br /> Professional Engineer. Soil cores will-be screened in the_field for the presence of volatile organic <br /> compounds using aphoto-ionization detector (PID). Alf down=hole drilling equipment will'be <br /> decontaminated with high pressure steam following the acompletion of each soil boring.Down-hole. <br /> sampling equipment will..be__dec_o_ntaminated betweensamples using an Alconox detergent solution` <br /> and a tap water rinse. <br /> The wells will be constr -' ch diameter,flush-threaded, schedule 40 poly vinyl chloride. <br /> (PVC)well casing with.,20 ft of 0.020-in6fi:factory-sl6tted well screen set at deptlis`of 35 to 55-ft bgs <br /> (MW-1 R and MW-31R)ans(MW-,1 D). A sand filter pack will be placed in'the annular <br /> space surrounding`the entire screened interval,-arid will extend approximately,one-to_two ft above <br /> the screen.interval. -A two to three-foot thick bentonite annular seal will be+placed'aljoVe the,-filter <br /> pack and will be hydrat4e he remainder of the annulars pace will be filled with neat cement and/or <br /> grout from the top of the}bentonite seal to within 12.inches of the surface:" The well will.be secured'' <br /> v <br /> with a locking well cap, and completed with a watertight traffic-rated_well box installed at grade: <br /> - <br /> 2.5 Soil Sample Analysis <br /> Soil samples selected for chemical analyses will be contained in two-inch-diameter by six-inch-long <br /> brass or stainless steel sleeves,which will then be sealed on each end with Teflon tape and plastic <br /> end caps. The soil samples selected for chemical analyses will be based on visual observations <br /> -and PID measurements. The selected samples will be placed on ice in,an insulated cooler until <br /> relinquished, under documented chain-of-custody control, to a California certified analytical <br /> laboratory. Selected soil samples will be analyzed for.GRO by Environmental Protection Agency <br /> (EPA) Method 8015B(M)and benzene, toluene,-.ethylbenzene;xylenes, MTBE, di-isopropyl ether, <br /> ethyl tert-butyl ether,tert-amyl.methyl ether,-tert-butyl..alcohol; ethanol;, 1,2-dichloroethane,}and <br /> 1,2-dibromoethane by EPA Method 8260B.-_ `" T <br /> . .. <br /> 2.6 Well Development <br /> Following well installation,the groundwater monitoring well seals will be allowed to cure for at least <br /> 48-hours,prior,to development. Development (to clean the filter pack and stabilize the aquifer <br /> materials around the slotted.well casings)will be accomplisIHed by rigorously surging the—.well over <br /> the length of the screen interval:with-a vented surge:block .followed fbyr.bailing.to,remove <br /> accumulated sedimentaand by purging approximately ten casing volumes of water.. Final.purging will <br /> be performed'with either a submersible:puTp_o_r bailer, during 0fiich'time,.pH, temperature, and <br /> conductivity will be me tired at reg lar intervals: Development will be considered co:mplete.when <br /> - . .. <br /> 2186 Work Plan for Vapor Probe Destruction,Well Destruction, and Well Installation,doc 4 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.