My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:30:44 AM
Creation date
2/15/2019 8:37:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> Work Plan for Vapor ProbeDestruction, Well Destruction and Well Installation <br /> ARCO Service Station No. 2186 <br /> October 14, 2008 <br /> 3.0 LIMITATIONS <br /> This report was prepared in accordance with the scope of work outlined in Stantec's contract and <br /> with generally accepted professional engineering and environmental consulting practices existing at <br /> the time this report was prepared and applicable to the location of the site. It was prepared for the <br /> exclusive use of ARC, a BP Affiliated Company,forthe express purpose stated above. Any re-use <br /> of this report for a different purpose or by others not identified above shall be at the user's sole risk <br /> without liability to Stantec. To the extent that this report is based on information provided to Stantec <br /> by third parties, Stantec may have made efforts to verify this third party information, but Stantec <br /> cannot guarantee the completeness or accuracy of this information. The opinions expressed and <br /> data collected are based on the conditions of the site existing at the time of the field investigation. <br /> No other warranties, expressed or implied are made by Stantec. <br /> Prepared by: Reviewed by: <br /> Brian Egger .Brian Westhoff <br /> Project Scientist Geologic Consultant <br /> All information,conclusions,and recommendations provided by Stantec in this document regarding <br /> the site have been prepared under the supervision of and reviewed by the licensed professional <br /> whose signature appears below. <br /> Licensed Approver. e9,pFESS/04 <br /> B N ��F i <br /> 14A0 160 <br /> Rusty Benkos P.E. a 583 M <br /> Principal Engineer EXP.1213112008 <br /> October 14, 2008 S'j C10- <br /> or C Pxtk <br /> 10-orCPxtk � <br /> cc: Mr. Sergio Morescalchi, ARC, a BP Affiliated Company(Upload to Enfos) <br /> Mr. James Barton, California Regional Water Quality.Control Board, Central Valley Region <br /> Upload to Geotracker <br /> 2186 Work Plan for Vapor Probe Destruction,Well Destruction, and Well Installation.doc 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.