My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:30:44 AM
Creation date
2/15/2019 8:37:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br /> 3212.North California Street <br /> Page 2 of 2 <br /> i <br /> i <br /> submit a technical argument demonstrating that the original proposal should be <br /> implemented over the EHD-recommcnded change. <br /> I <br /> In Quarterly Groundwater Monitoring and Remediation Progress Report Second Quarter <br /> 2007 dated August 13, 2007, SECOR requests.a reduction for sampling and monitoring <br /> MW-2, MW-3, MW-4, MW-6, and MW-7 from quarterly to semi-annually beginning <br /> third quarter 2007. SECOR also requests M W-'1, MW=5 and MW-8 be removed from the <br /> quarterly monitoring schedule altogether. However,.in another paragraph SECOR states <br /> that a petroleum hydrocarbon plume exists ..near MW-1 and recommends continued i <br /> groundwater monitoring. Upon review of historical and current analytical groundwater <br /> results EHD believes D:I.PE, ETBE, TAME, ethanol, and EDB may be removed .from the ! <br /> analytical list of compounds since these compounds have not been detected recently in <br /> groundwater samples collected from any monitoring well. EHD also approves annual <br /> .sampling for MW-2, MW-3, MW-5, MW-6, .MW-7, MW-8, and VW-4. Continue <br /> collecting groundwater samples quarterly from MW4, VW-1$, VW-2'B, and GVW-3B', <br /> and collect .groundwater samples semi-annually from MW-4. Continue to collect depth ! <br /> to. water measurements for every vapor and monitoring well during each quarterly <br /> groundwater monitoring event for the purpose of determining the groundwater gradient; <br /> and please remove casing caps from all monitoring wells and allow adequate time for the ! <br /> groundwater level to stabilize before taking depth to water measurements. Reccnt <br /> groundwater elevation contour maps do not exhibit a definitive groundwater flow E <br /> direction and EHD is concerned the groundwater has not been given enough time to <br /> equilibrate aper removing the casing caps.. <br /> Submit a well permit application and permit fee of$89 to EHD by October 25, 2007, and <br /> notify EHD at least a week prior to the scheduled fieldwork. Please contact Vicki <br /> McCartney at (209) 408-9852 or by email at if if you have any <br /> questions regarding this letter. <br /> Donna'Reran,RENS, Director <br /> Environmental Health Department <br /> Victoria L. McCartney, Senior REHS Nuel C. Henderson,Jr.,PG <br /> Unit IV-Site Mitigation Engineering Geologist <br /> Unit IV-'Site Mitigation <br /> c: Rusty Benkosky, PE - SECOR <br /> James L.L. Barton,PG- CVRWQC13 . <br /> - E <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.