Laserfiche WebLink
i <br /> S E C 0 R <br /> Work Plan for Soil Vapor Survey <br /> August 9, 2007 <br /> ARCO Service Station No. 2186 <br /> Page 7 of 8 <br /> SCHEDULE <br /> SECOR is prepared to initiate field activities upon approval of this work plan by the SJCEHD. <br /> SECOR anticipates that fieldwork will require approximately 6 to 8 weeks to complete, following <br /> the receipt of valid well installation_permits�-from'SJCEHD.— <br /> LIMITATIONS <br /> This report was prepared in accordance with the scope of work outlined in SECOR's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this report was prepared and applicable to the location of'the site. It was <br /> prepared for the exclusive use of Atlantic Richfield Company, a BP affiliated company, for the <br /> express purpose stated above. Any re-use of this report for a different purpose or by others not <br /> identified above shall be at the user's sole risk without liability to SECOR. To the extent that this <br /> report is based on information provided to SECOR by third parties, SECOR may have made <br /> efforts to verify this third party information, but SECOR cannot guarantee the completeness or <br /> accuracy of this information. The opinions expressed and data collected are based on the <br /> conditions of the site existing at the time of the field investigation. No other warranties, <br /> expressed or implied are made by SECOR. <br /> Sincerely, <br /> SECOR International Incorporated <br /> Prepared by: Reviewed by: <br /> Michael Sperber Brian Westhoff <br /> Project Geologist Senior Geologist <br /> Information, conclusions, and recommendations provided by SECOR in this document <br /> regarding the site has been prepared under the supervision of and reviewed by the licensed <br /> professional whose signature appears below. <br /> Licensed Approver: ROFE�1ONq J <br /> l <br /> Off, <br /> LU C5 rn <br /> Rusty Benk sky, E. EXP,12/3112008 <br /> Principal Engin r <br /> August 9, 2007 FO fi CAUF���\P <br /> i <br /> 2186 SVI 8-07.doc SECOR International Incorporated <br />