My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:30:44 AM
Creation date
2/15/2019 8:37:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> Well Destruction Work Plan <br /> ARCO SerVice Station No:2186 <br /> February 7, 2012 <br /> LIMITATIONS <br /> This Work Plan was prepared in accordance with the scope of work outlined in 'Stantec's <br /> contract and with generally accepted professional engineering and environmental consulting <br /> practices existing at the time this Work Plan was prepared and applicable to the location of the <br /> site. It was prepared for the exclusive use of Atlantic Richfield Company, a BP affiliated <br /> company, for the express purpose stated above. Any re-use of this Work Plan for a different <br /> purpose or by others not identified above shall be at the user's sole risk without liability to <br /> Stantec. To the extent that this Work Plan is based on information provided to Stantec by third <br /> parties, Stantec may'have made efforts to verify this third party information, but Stantec cannot <br /> guarantee the completeness or accuracy of this information. The opinions expressed and data <br /> collected are based on the conditions of the site existing at the time of the field investigation. <br /> No other warranties, expressed or implied are made by Stantec. <br /> Prepared by: Reviewed by: <br /> gEngin <br /> seeA�ssociate <br /> Catherine Francini <br /> Project Manager <br /> Information, conclusions, and recommendations provided by Stantec in this document regarding <br /> the site have been prepared under the supervision of and reviewed by the licensed professional <br /> t <br /> whose signature appears below. <br /> e <br /> Licensed Approver: <br /> gS\pNAL GFO`O <br /> r N <br /> Brian Westhoff, P.G. BRIAN D.WESTHOFF —3 <br /> Senior Geologist No.8784 • <br /> February 7, 2012 9T Qom. <br /> . �OF C AoF� . <br /> Attachment: <br /> Figure 1 Site Plan <br /> Table 1 Soil Boring and Well Construction Details <br /> Table 2 Historical Groundwater Monitoring &Analytical Data <br /> Appendix A SJCEHD Letter Dated January 4, 2012 <br /> Appendix.B Boring Logs <br /> cc: Mr. Sergio Morescalchi, ARCO (upload to Enfos) <br /> Upload to Geotracker <br /> 2186 Well Destruction Work Plan.doc 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.