Laserfiche WebLink
San 'Joaquin County DIRECTOR <br /> Donna Heran,REHS <br /> Environmental Health Department ASSISTANT DIRECTOR <br /> 7 600 East Main Street Laurie Cotulla,REHS <br /> $ <br /> 1 -3029 <br /> Stockton', California 95202 PROGRAM COORDINATORS <br /> Carl Borgman, REHS <br /> Mike Huggins,REHS,RDI <br /> Website: www.sjgov.org1ehd <br /> Margaret Lagorio,REHS <br /> 4:j p Phone: (209)468-3420 Robert McClellon, REHS <br /> Fax: (209)464-0138 Jeff Carruesco, REHS,RDI <br /> Kasey Foley,REHS <br /> SERGIO MORESCALCHI <br /> SEP 17 2007 <br /> ATLANTIC RICHFIELD COMPANY <br /> P 0 BOX 1257 <br /> SAN RAMON CA 94583 <br /> RE: ARCO/BP Sites in San Joaquin County <br /> A meeting was held on September 13, 2007, at the office of San Joaquin County Environmental <br /> Health Department(EHD). Attending the meeting were you representing ARCO/BP,Rusty <br /> Benkosky and Brian Westhoff representing SECOR,Margaret Lagorio,Noel C. Henderson,Michael <br /> Infurna,Lori Duncan, and Vicki McCartney representing EHD. The following is a synopsis of the <br /> status and/or site specific discussions at the meeting. <br /> 2478 E. Oak Street, Stockton.#443 <br /> The report on the installation of the new wells should be submitted to EHD soon. It has been <br /> about three months since the work was completed. <br /> 1612 Hammer Lane. Stockton, #548 <br /> The off-site property owners have not signed the access agreements for installation of wells on their <br /> property. SECOR will send another request and if there is still no cooperation EHD,,vill request <br /> cooperation once SECOR provides copies of correspondence sent to those property owners. <br /> SECOR will check into putting the well to the east in the public right-of way. The City of Stockton <br /> is making improvements along Hammer Lane and some of the wells at 1612 Hammer may need to <br /> be destroyed. The EHD will provide more information on this when it becomes available. <br /> 6100 N. HiV_hway 99, Stockton, #595 <br /> Monitoring of the two wells remaining for this site Will continue until the California Department of <br /> Transportation has completed construction of the highway interchange. <br /> 7906 N. El Dorado Street, Stockton, #2130 <br /> New wells have been installed for the site. The on-site vapor well will be scheduled for destruction <br /> soon, <br /> 441 Charter Way, Stock-ton,#2168 <br /> The inlet on the air sparge system melted so the system is not operating. Once the inlet is repaired <br /> and the system is modified it will resume operation. The soil vapor extraction system is operating. <br /> 3212 N. California Street, Stockton, #2186 J <br /> The EHD approved the soil vapor extraction rebound test plan. A Site Conceptual Model should be <br /> submitted to EHD this week. A response to moving VP-1 will be submitted to EHD in a week. <br /> 205 N. Center Street, Stockton, #4493 1 <br /> ARCO plans to continue monitoring the contaminant plume from this site. The EHD previously <br /> recommended batch extraction of groundwater in the area of the MW4/MNV, 8/NlW12 well cluster to <br /> reduce mass and speed up the possibility of closure. ARCO was concerned it would move more <br />