Laserfiche WebLink
Page 2 of 3 h <br /> i <br /> Please let me know if you have any other questions. <br /> Regards, <br /> Catherine <br /> From: Adrienne Ellsaesser [EH] [mailto:AEllsaesser@sjcehd.com] <br /> Sent: Monday, July 09, 2012 1:22 PM <br /> To: Francini, Catherine <br /> Cc: Morescalchi, Sergio; Westhoff, Brian; Herrmann, Patrick; Vicki McCartney [EH] <br /> Subject: RE: BP 2186 Well Destruction (3212 North California Street) <br /> Catherine, <br /> For VW-1A/B and VW—2A/B, you may seal up to surface grade. <br /> For MW-1D, I need more information on the conductor casing. How deep is it, does it have an annular seal,and <br /> what sealant was used if there is an annular seal. What type of MW casing is inside the conductor casing, how <br /> deep and depth of annular seal? <br /> Thanks, <br /> Adrienne <br /> Adrienne Ellsoesser, REH5 <br /> Acting Program Coordinator <br /> SanJoaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue <br /> Stockton , CA 95205 <br /> Ph (209)468-0343 <br /> Fax:(209)468-0341 <br /> ae I Isaesser@ s_i ceh d.com <br /> From: Francini, Catherine [mailto:Catherine.Francini(astantec.com] <br /> Sent: Monday, July 09, 2012 10:04 AM <br /> To: Adrienne Ellsaesser [EH] <br /> Cc: Morescalchi, Sergio; Westhoff, Brian; Herrmann, Patrick; Vicki McCartney [EH] <br /> Subject: BP 2186 Well Destruction (3212 North California Street) <br /> Hello Adrienne, <br /> Thank you for your assistance with the well destruction activities currently going on at 3212 North California <br /> Street. A few questions have come up and we would appreciate your guidance. <br /> VW=.1A/B and VW-2A/B., <br /> Will the top three feet need to be removed from wells VW-1A/B and VW-2A/B? The current well vaults <br /> surrounding VW-1A/B and VW-2A/B will not allow for capping with a diameter of at least one foot greater than the <br /> diameter of the originally drilled hole, unless the vault is completely removed. These vaults are very close to the <br /> tank pits and complete removal of the vault will be dangerous. Since the well vaults will not be removed <br /> STANTEC will achieve the maximum allowable concrete cap given vault dimensions. <br /> MW=1 D: <br /> 7/11/2012 <br />