Laserfiche WebLink
r a drvlsion of <br /> I/1RONMENTAL SOLUTIONS MC®R <br /> I � <br /> . r• rQ <br /> May 11, 1999 <br /> Project 20805-147.006 <br /> Mr. Paul Supple <br /> ARCO Products Company <br /> P.O. Box 6549 <br /> Moraga, California 94570 <br /> Re: Quarterly Groundwater Monitoring Report, First Quarter 1999, for ARCO Service Station <br /> No. 2186, Located at 3212 North California Street, Stockton, California <br /> Dear Mr. Supple: <br /> Pinnacle Environmental Solutions, a division of EMCON (Pinnacle), is submitting the attached <br /> report which presents the results of the first quarter 1999 groundwater monitoring and sampling <br /> program at ARCO Products Company (ARCO) Service Station No. 2186, located at 3212 North <br /> California Street, Stockton, California. Tyle quarterly monitoring program is in compliance with <br /> the San Joaquin County Public Health Services (SJCPHS) requirements regarding underground <br /> storage tank investigations. <br /> LIMITATIONS <br /> No monitoring event is thorough enough to describe all geologic and hydrogeologic conditions <br /> of interest at a given site. If conditions have not been identified during the monitoring event, <br /> such a finding should not, therefore, be construed as a guarantee of the absence of such <br /> conditions at the site, but rather as the result of the scope, limitations, and cost of work <br /> performed during the monitoring event. <br /> Please call if you have questions. <br /> Sincerely, <br /> Pinnacle <br /> J e Coffman J J n, R. 586 <br /> Project Manager en' r Pr 'ect Supervisor <br /> Attachment: Quarterly Groundwater Monitoring Report, First Quarter 1999 <br /> cc: L Carol Oz, San Joaquin County Public Health Services <br /> Elizabeth Thayer, California Regional Water Quality Control Board <br /> Catherine R. Bevanda, Property Owner <br /> CP1E:1ARCO\21861QTRLY12186Q 199.DOC-98Usg:1 <br /> 3939 Cambridge Road,Suite 220 Cameron Park,California 95682 (530)676-6884 (530)676-6885 Fax <br />