Laserfiche WebLink
Ms Carol Oz Project 20805-147 007 <br /> Apnl 15, 1999 <br /> Page 4 <br /> • CPT boring logs <br /> • geologic cross-sections depicting subsurface conditions <br /> SCHEDULE <br /> Pinnacle will begin work within 14 days (2 weeks) of receiving approval of this work <br /> plan Initial work will include obtaining drilling and encroachment permits <br /> Please call if you have any questions regarding this workplan <br /> Sincerely, <br /> Vnical <br /> . Mark Capps <br /> tor Project Manager <br /> R G 6561 <br /> Attachments Figure 1 Site Location Map <br /> Figure 2 Proposed CPT Boring/Groundwater Sampling <br /> Locations <br /> Appendix A Site Safety and Operations Plan <br /> Appendix B Well Survey Summary <br /> Appendix C Field Procedures <br /> cc Paul Supple, ARCO Products Company <br /> is <br /> CP\E 1ARC0\2186\REP0RT5\2186P103 DOC-991159 1 �`"� <br />