My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012816
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
ARCHIVED REPORTS XR0012816
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 11:01:40 AM
Creation date
2/15/2019 9:50:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012816
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms Carol Oz Project 20805-147 007 <br /> February 19, 1999 <br /> Page 3 <br /> methyl ether using USEPA Method 8260, and total lead using USEPA Method 7420 <br /> Additional Excavation and Soil Sampling <br /> If warranted, Pinnacle will observe limited overexcavation in the vicinity of the former <br /> product lines and dispenser locations If field evidence indicates hydrocarbons remain in <br /> place Pinnacle will direct the subcontractor to overexcavate until field screening data <br /> (using a photoionization detector [PID]) of soil samples collected from the base and <br /> sidewalls of the excavated area indicate soil containing relatively high concentrations of <br /> hydrocarbons have been removed Overexcavation of soil will be limited to two feet <br /> laterally and six feet vertically <br /> Stockpiled Soil Sampling <br /> Soil generated during the removal of the product delivery lines and dispensers will be <br /> temporarily stored on site and placed on and covered with visqueen One four point <br /> composite sample will be collected for every 100 cubic yards of stockpiled soil The <br /> samples will be composited by the laboratory and will be analyzed for TPHG, BTEX, and <br /> total lead using the methods discussed above <br /> Reporting <br /> Pinnacle will prepare a report summarizing the product delivery line and dispenser <br /> removal activities and verification soil sampling Copies of the certified analytical reports <br /> will be appended <br /> Please call if you have any questions regarding this workplan <br /> Sincerely, <br /> Pinnacle <br /> A�/ <br /> /David Foley Mark Capps <br /> Staff Geologist Project Manager <br /> R G 6561 <br /> CP\E\ARC0121861REP0RTS12186P101 DOC-98\Isg 1 �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.