My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000772
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
ARCHIVED REPORTS XR0000772
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 4:01:25 PM
Creation date
2/15/2019 2:11:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000772
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phillips 66 Company 5 <br /> Circle K Store#1205 16470 Cambridge Street Lathrop CA February 27 2002 <br /> . SCHEDULE <br /> SECOR is prepared to initiate field work on March 29, 2002 provided the work plan is <br /> approved, encroachment permits from the City of Lathrop and access agreements with <br /> private property owners are secured, and the soil boring and well construction permits <br /> can be obtained from the SJC-EHD by March 28, 2002 A report documenting the <br /> findings of the installation of monitoring wells is anticipated to be submitted <br /> approximately four to eight weeks after the completion of the field work and upon <br /> receipt of all analytical data from the laboratory SECOR will submit an addendum to <br /> this workplan showing the proposed locations of groundwater monitoring wells based <br /> on the data gathered during the Geoprobe® investigation and will proceed with the <br /> installation of off-site groundwater monitoring wells subsequent to approval from SJC- <br /> EHD <br /> If there are any questions regarding the contents of this work plan, please call us at (916) <br /> 861-0400 <br /> Sincerely, <br /> SECOR International Incorporated <br /> Thomas Y Parker <br /> Staff Geologist Q�o? ti�sE,vKa�Fy� <br /> mo C <br /> cc 058399 <br /> Rust Benkosky, <br /> CX0I <br /> Senior EngineerCF�A�e <br /> Attachments Figure 1 - Site Map <br /> Figure 2 - Site Map With Proposed Well Locations <br /> Attachment A - Site Health and Safety Plan <br /> Attachment B - Field and Laboratory Procedures <br /> cc Mr Ed Ralston, Phillips 66 Company <br /> Mr Marty Hartzell, Regional Water Quality Control Board, Central Valley Region <br /> i <br /> TOSCO/1205!W KPLAN 1205 <br />
The URL can be used to link to this page
Your browser does not support the video tag.