Laserfiche WebLink
Phillips 66 Company 2 <br /> T Stag n#1205,16470 Cam Street Lathrop,CA Febru 19 2 2 <br /> In July1998, one Geoprobe TM boring was advanced to a depth of 40 feet below ground <br /> • surface (bgs) downgradient (north) of the former UST excavation Laboratory analysis of <br /> soil reported maximum concentrations of TPHg and MtBE of 1,900 ppm(GP-1-10') and <br /> 0 31 ppm (GP-140'), respectively Laboratory analysis of groundwater reported <br /> concentrations of TPHg and MtBE of 52,000 ppb and 61 ppb, respectively (PEG, 1999) <br /> From August through September 1998, IT Corporation (IT) drilled and installed four <br /> groundwater monitoring wells (MW-1 through MW-4) to approximate depths of 26 to 28 <br /> feet bgs During the installation of well MW-4, the drill auger broke through a city of <br /> Lathrop water main releasing approximately 600,000 to 1,000,000 gallons of water <br /> Laboratory analysis of soil reported maximum concentrations of TPHg and MtBE of 6,800 <br /> ppm (MW-3-16') and 7 2 ppm (MW-2-1 F), respectively Laboratory analysis of <br /> groundwater reported maximum concentrations of TPHg and MtBE of 29,000 ppb (MW-1) <br /> and 4,000 ppb (MW-2), respectively (PEG, 1999) <br /> In December 2000, IT drilled and installed five groundwater monitoring wells (MW-5 <br /> through MW-9) to approximate depths of 24 feet bgs Laboratory analysis of soil reported <br /> maximum concentrations of TPHg and MtBE of 473 ppm (MW-9-10') and 0 119 ppm <br /> (MW-6-20'), respectively Laboratory analysis of groundwater reported maximum <br /> concentrations of TPHg and MtBE of 72,000 ppb (MW-6) and 750 ppb (MW-6), <br /> respectively (IT, 2001) <br /> In March 1999, IT performed a Sensitive Receptor Survey and reported 12 wells within a <br /> • 1/2-miles radius of the site The closest wells to the site are approximately 0 15-mile <br /> west/southwest (upgradlent) of the site The nearest downgradient wells are located <br /> approximately 0 3 northeast of the site (IT, 2001) <br /> Groundwater monitoring has been performed since August 1998 Fourth Quarter 2001 <br /> groundwater monitoring reported high concentrations ( 10,000 ppb) of TPHg in wells <br /> MW-1, MW-5, MW-6, MW-7, and MW-9 The highest concentrations of benzene and <br /> MtBE were 780 ppb (MW-7) and 660 ppb (MW-6) Groundwater flow was to the <br /> northeast with a gradient of approximately 0 001 ft/ft Depth to groundwater ranged from <br /> 12 50 (MW-9) to 14 32 (MW-3) feet bgs (GR, 2001) <br /> PROPOSED SCOPE OF WORK <br /> Task 1 --Pre-Event Activities <br /> Prior to conducting the DPE event, SECOR will submit a letter of notification to the San <br /> Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) SECOR will also <br /> prepare a site-specific Health and Safety Plan (HASP) The HASP is required by the <br /> Occupational Health and Safety Adrrvmstration (OSHA) "Hazardous Waste Operations <br /> and Emergency Response" guidelines (29 CFR 1910 120), and by California Occupational <br /> Health and Safety Administration (Cal-OSHA) "Hazardous Waste Operations and <br /> • Emergency Response" guidelines (CCR Title 8, Section 5192) The Health and Safety <br /> File TOSCO112051MTS11205-5-Day DPE Work Plan doe <br />