My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000783
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
ARCHIVED REPORTS XR0000783
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 5:02:00 PM
Creation date
2/15/2019 2:24:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000783
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r�' • sl <br /> • CHARACTERIZATION/REMEDIAL STATUS <br /> Impacted soil delmeated9 Lateral Ye <br /> Vertical Ye <br /> Impacted groundwater delineated? N <br /> Current Phase of Project? Groundwater monitoring and Assessmen <br /> Frequency of Sampling9 Quarterl <br /> Current Remediation Techniques9 N/ <br /> Soil remediation in progress9 N <br /> Anticipated start? NI <br /> Anticipated completion? N/ <br /> Groundwater Gradient9 North at 0 0015 ft/f <br /> Dissolved/free product remediation in progress9 N <br /> Anticipated start? N/ <br /> Anticipated completion? NI <br /> CONCLUSIONS: <br /> The lateral extent of soil impacts is generally defined with the exception of the capillary fringe <br /> The off-site soil impacts are likely due to migration of impacted groundwater away from the site <br /> • Off-site upgradient groundwater impacts are delineated by well MW-8 Groundwater sampling <br /> results for off-site wells MW-5, MW-6, and MW-9 indicate that the groundwater impacts are <br /> undefined downgradient of the site The highest detected dissolved benzene and MTBE <br /> concentrations are in well MW-5, located approximately 30 feet downgradient of the USTs <br /> RECOMMENDATIONS: <br /> IT recommends preparing a workplan for further groundwater investigation that includes a <br /> groundwater grab sampling program to further delineate the shallow groundwater impacts The <br /> grab sample data will be evaluated prior to proposing monitoring well locations The tentative <br /> schedule for further assessment is 1) workplan submittal in the third quarter 2001, 2) obtaining <br /> access agreements and encroachment permits at the end of the third quarter or beginning of the <br /> fourth quarter 2001, and 3) implementation of the assessment in the late third quarter or early <br /> fourth quarter 2001 <br /> CONSULTANT: IT Corporation <br /> 8221211822125 1 a doc 3 07/12/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.