My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000785
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
ARCHIVED REPORTS XR0000785
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 5:16:55 PM
Creation date
2/15/2019 2:25:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000785
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GETTLER - RYAN NC. <br /> February 13, 2001 <br /> G-R Job#180183 <br /> Mr Edward C Ralston <br /> Tosco Marketing Company <br /> 1380 Lead Hill Road, Suite 120 <br /> Roseville,California 95561 <br /> RE First Quarter Event of January 8,2001 <br /> Groundwater Monitoring & Sampling Report <br /> Tosco (Circle K) Unit#01205 <br /> 16470 Cambridge Street <br /> Lathrop, California <br /> Dear Mr Ralston <br /> This report documents the well development and most recent groundwater monitoring and sampling event <br /> performed by Gettler-Ryan Inc (G-R) at the referenced site All field work was conducted in accordance with, <br /> G-R.Standard Operating Procedure - Groundwater Sampling (attached) <br /> Static groundwater levels were measured and all wells were checked for the presence of separate-phase <br /> hydrocarbons Separate-phase hydrocarbons were not present in the wells Static water level data and <br /> groundwater elevations are summarized in Table 1 <br /> Groundwater samples were collected from the monitoring wells as specified by G-R Standard Operating <br /> Procedure - Groundwater Sampling (attached) The field data sheets are also attached The samples were <br /> analyzed by Sequoia Analytical Analytical results are summarized in Tables 1 and 2 The chain of custody <br /> document and laboratory analytical reports are also attached <br /> Sincerely, l <br /> Deanna Na rding� Y <br /> Project Coordinator <br /> Table 1 Groundwater Monitoring Data and Analytical Results <br /> Table 2 Groundwater Analytical Results-Oxygenate Compounds <br /> Attachments Standard Operating Procedure-Groundwater Sampling <br /> Field Data Sheets <br /> 0120 qnd Chain of Custody Document and Laboratory Analytical Reports <br /> I <br /> 6747 Sierra Court , Suite J Dublin , California 94568 ( 925) 551 -7555 <br />
The URL can be used to link to this page
Your browser does not support the video tag.