My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000649
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000649
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 8:14:48 PM
Creation date
2/15/2019 3:09:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000649
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quarterly Report - First Quarter 2005 <br /> FLAG CITY CHEVRON <br /> 6421 Capitol Avenue, Lodi, California <br /> TABLE OF CONTENTS <br /> FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 -Site Map <br /> Figure 3 - Vertical Gradient Cross Section C-C' March 2005 <br /> Figure 4 - First Zone Aquifer Ground Water Elevation Map March 2005 <br /> Figure 5 - Second Zone Aquifer Ground Water Elevation Map March 2005 <br /> Figure 6 - Secondary Aquifer Zone Ground Water Elevation Map March 2005 <br /> Figure 7 -Primary Aquifer Zone Ground Water Elevation Map March 2005 <br /> Figure S - Estimated Extent of First Zone Dissolved MTBE March 2005 <br /> Figure 9 - Estimated Extent of Second Zone Dissolved MTBE March 2005 <br /> Figure 10 -Dissolved MTBE-Impact Cross Section C- C' March 2005 <br /> TABLES <br /> Table 1- Summary of Monitoring/Extraction Well Details <br /> Table 2- Ground Water Elevation Data <br /> Table 3-Analytical Results of Ground Water Monitoring Well Samples <br /> Table 4-Analytical Results of Ground Water Monitoring Well Samples - 28& 29 March 2005 <br /> APPENDICES <br /> Appendix A - Three B's Truck Plaza Ground Water Monitoring Data <br /> Appendix B - Ground Water Monitoring Well Field Logs <br /> Appendix C -Laboratory Report of Ground Water Monitoring Well Analytical Results <br /> Appendix D - GeoTracker Transmittal Confirmation <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.