My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000660
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000660
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 7:20:55 PM
Creation date
2/15/2019 3:12:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000660
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' 31 August 2000 <br /> AGE Project No 96-0232 <br />' Page 17 of 25 <br />' 5.0. SCOPE OF WORK <br /> Upon RWQCB approval, AGE anticipates initiating installation activities of the pump and treat <br />' ground water remediation system by 01 October 2000 <br /> In accordance with the RWQCB Cleanup and Abatement Order No 5-00-700, dated 01 March 2000 <br />' and the RWQCB-approval letter, dated 16 August 2000, an RWQCB-approved remediation system <br /> shall be implemented and continuously operated at the site by 01 November 2000 _ <br />' Based upon the results in the Problem Assessment Report, dated 19 June 2000, the RWQCB is <br /> requiring remediation of petroleum hydrocarbon impact to soil and ground water at the site <br />' Remediation within the petroleum hydrocarbon-impacted area at the site will consist of the following <br /> tasks <br />' 4 Permitting, planning and pre-field work activities, <br /> • Installation of remediation wells, <br /> 0 Installation of underground remediation piping system, <br /> • Ground water extraction and treatment system start-up, <br />' 0 Monitoring and maintenance, <br /> • Progress/confirmation sampling <br />' Each of these tasks are discussed below in detail <br />' 5 1 PERMITTING,PLANNING AND PRE-FIELD WORK ACTIVITIES <br />' Applicable permits will be obtained from the RWQCB and the PHS-EHD prior to initiation of the <br /> remediation project An RWQCB NPDES permit will be required for surface discharge of the treated <br /> ground water into the conveyance ditch AGE will submit an NPDES to the RWQCB by 15 <br />' September 2000,AGE anticipates a 30-day turnaround time for RWQCB approval of the permit San <br /> Joaquin County encroachment permits will be necessary for trenching activities to the conveyance <br />' ditch located 500 feet south of the site AGE will submit an application to the San Joaquin County <br /> Public Works Department for encroachment by 15 September 2000, AGE anticipates a 30-day <br /> turnaround time for San Joaquin County approval of the encroachment permit As required by the <br />' PHS-EHD, drilling permits will be necessary for installation of ground water extraction wells and <br /> a health and safety plan prepared in accordance with Occupational Safety and Health Guidance <br /> Manual for Hazardous Waste Site Activities (National Institute for Occupational Safety and Health <br />' Administration, U S Coast Guard and U S Environmental Protection Agency, 1985) AGE will <br /> Advanced GeoEnviraamental,Inc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.