Laserfiche WebLink
i <br />' 31 August 2000 <br /> AGE Project No 96-0232 <br />' Page 18 of 25 <br /> I submit drilling permits by 15 September 2000, AGE anticipates a 14-day turnaround time for PHS- <br /> EHD approval of the permit Prior to digging activities, each proposed digging location will be <br /> clearly marked at least 48-hours in advance and a utility clearance obtained through Underground <br /> Service Alert Installation of a 20- by 30-foot chain-link gated enclosure will be located in the <br /> southwest section of the site to secure the ground water treatment system, AGE anticipates <br /> completion of the gated enclosure by 01 October 2000 <br /> 5 2 INSTALLATION OF REMEDIATION WELLS <br /> IA ground water extraction system in conjunction with on-site treatment is proposed to reduce <br /> petroleum hydrocarbon mass and MTBE mass within the "core" impacted area at the site In order <br /> to maximize the efficiency of the clean-up efforts, a 24-hour operation of the system is planned <br /> Typical ground water extraction treatment rate is expected to be less than laboratory detection levels <br /> I of dissolved petroleum hydrocarbons and MTBE throughout the entire cleanup duration The pilot <br /> test performed at Former Texaco/Big Bear Chevron Service Station (Section 4 1 1) utilizing the <br /> GAC/SunSolve series and the documents provided by Pure Effect Incorporated (Appendix J) <br /> I� demonstrate the efficiency of the treatment system to remove the above referenced dissolved <br /> substances <br /> Seven additional ground water extraction wells will be installed at the site to supplement remediation <br /> efforts of the core petroleum hydrocarbon-impacted area at the site Proposed ground water <br /> extraction well locations are illustrated in Figure 9 <br /> IBased on an estimated radius of influence of 20 feet for each extraction well in the First Aquifer <br /> Zone (Section 3 2 ), AGE proposes installation of ground water extraction wells in the following <br /> Ilocations <br /> • approximately 10 to 20 feet west of P 18 in landscaped area, , <br /> • approximately 10 to 20 feet north of MW-9 in landscaped area, <br /> • approximately 5 to 15 feet southeast of P25 near the west section of the UST pit area, <br /> Ia approximately 10 to 20 feet east of P 12 near the southeast corner of the UST pit area <br /> • approximately 10 to 20 feet north of P24 near the northeast section of the UST pit area <br /> • approximately 10 to 20 feet north of P33 near the northeast fuel dispenser area <br /> • approximately 5 to 15 feet northeast of P6 near the southeast fuel dispenser area <br /> Advanced GeoEnvironmental,Inc <br /> I <br />