Laserfiche WebLink
TABLE OF CONTENTS <br /> Page <br /> 10 INTRODUCTION . .. ... . ... ... . . . . .. . . . 1 <br /> 20 BACKGROUND ........ . .. .. ... ..... .. ... .... .. . . 1 <br /> 21 SITE DESCRIPTION l <br /> 22 PREVIOUS INVESTIGATION 1 <br /> 23 REGIONAL GEOLOGIC SETTING 9 <br /> 24 GROUND WATER DEPTH AND FLOW DIRECTION 10 <br /> 3.0 AQUIFER PUMP TEST ... .... .. .. ...... .. . .. ... .... .. 10 <br /> 31 AQUIFER STEP DRAW-DOWN PUMP TEST, 14 MARCH 2000 10 <br /> 32 FIRST ZONE AQUIFER PUMP TEST, 20 AND 24 JULY 2000 11 <br /> 33 SECOND ZONE AQUIFER PUMP TEST,21 JULY 2000 13 <br /> I40 PROPOSED GROUND WATER TECHNOLOGY .. .. .. .. 14 <br /> 41 PROPOSED GROUND WATER TREATMENT SYSTEM 14 <br />' <br /> 41 Ground Water Remediation Pilot Study Utilizing GAC/SunSolve Treatment 14 <br /> 42 CLEAN-UP GOALS 15 <br /> 43 ON-SITE REMEDIATION 16 <br /> 44 OFF-SITE REMEDIATION 16 <br /> 45 SECOND ZONE AQUIFER GROUND WATER EXTRACTION AND TREATMENT 16 <br /> 5.0. SCOPE OF WORK 17 <br /> 51 PERMITTING,PLANNING AND PRE-FIELD WORK ACTIVITIES 17 <br /> .� <br /> 52 INSTALLATION OF REMEDIATION WELLS 18 <br /> 53 INSTALLATION OF REMEDIATION PIPING SYSTEM 19 <br /> 54 WELL PUMPS, INSTALLATION AND PROCESS PIPING 19 <br /> 55 WELL AND PROCESS PUMP CONTROLLERS 19 <br /> 56 TREATMENT SYSTEM 20 <br /> 57 REMEDIATION SYSTEM START-UP PERIOD 20 <br />' <br /> 58 MONITORING AND MAINTENANCE ACTIVITIES 20 <br /> 59 PROGRESS AND CONFIRMATION SAMPLING 21 <br /> 6.0, PROCEDURES 22 <br /> 61 DRILLING ACTIVITIES 22 <br /> 62 SYSTEM DESIGN 22 <br /> 6 2 1 Ground Water Extraction Well Installation 23 <br /> 622 Ground Water Extraction Piping System 23 <br /> 623 Ground Water Discharge Piping System 23 <br /> 624 Ground Water Extraction Monitoring Actirnhes 23 <br /> 63 PROCESS AND CONFIRMATION SAMPLING 24 <br /> 7.0 EQUIPMENT AND OPERATIONAL SAFETY . . . .. . ... .. ... 25 <br /> i <br /> IAdvanced GeoEnvironmental,Inc. <br />