My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000660
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000660
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 7:20:55 PM
Creation date
2/15/2019 3:12:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000660
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' TABLE OF CONTENTS <br />' LIST OF FIGURES <br /> Figure 1 -Location Map <br />' Figure 2-Site Plan <br /> Figure 3 - Geological Cross Section A-A' <br /> Figure 4-Geological Cross Section B-B' <br /> Figure 5-Geological Cross Section GC' <br />' Figure 6- Geological Cross Section D-D' <br /> Figure 7- Geological Cross Section E E' <br /> Figure 8 -Proposed Remediation System Design <br />' Figure 9-Proposed Ground Water Extraction Well Locat:ons With Estimated Radius of Influence <br /> Figure 10-Proposed Piping System <br /> Figure 11 -Proposed Off-site Discharge Piping System <br />' Figure 12-Proposed Ground Water Extraction Well Design <br /> Figure 13 - Trench Diagram- Cut View <br />' LIST OF TABLES <br /> Table 1 - Ground Water Step Draw-down Pump Test Results <br />' Table 2-Ground Water Draw-Down Results, Ground Water Extraction from EW-2 at 4 GPM <br /> Table 3-Ground Water Draw-Down Results, Ground Water Extraction from EW-2 at 6 6 GPM <br /> Table 4-Ground Water Draw-Down Results, Ground Water Extraction from EW-2 at 10 GPM <br /> . Table 5- Ground Water Draw-Down Results, Ground Water Extraction from EW-3 at 10 GPM <br /> ITable 6- Ground Water Pump Testing Results <br /> LIST OF APPENDICES <br /> Appendix A-First Zone Step Draw-down Ground Water Pump Test 14 March 2000 <br />' Appendix B-First Zone Ground Water Pump Test at 4 0 GPM 20 July 2000 <br /> Appendix C-First Zone Ground Water Pump Test at 6 6 GPM 20 July 2000 <br /> Appendix D-First Zone Ground Water Pump Test at 10 GPM 24 July 2000 <br /> Appendix E- Transmissivity and Storativity Calculations <br />' Appendix F-Estunated draw <br /> Appendix G-Additional GAC and Sunsolve information <br /> Appendix H-Second Zone Ground Water Pump Test at 10 GPM 21 July 2000 <br />' Appendix I-Additional GAC&SunSolve Information ' <br /> Appendix J- GAC&SunSolve Ground Water Extraction And Treatment Pilot Study <br /> I <br /> I <br /> Advanced GeoEnnronmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.