My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000662
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000662
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 6:29:56 PM
Creation date
2/15/2019 3:15:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000662
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Quarterly Report - Third Quarter 2004 <br /> FLAG CITY CHEVRON <br /> 6421 Capitol Avenue, Lodi, California v <br /> TABLE OF CONTENTS <br /> - FIGURES - - - - - - - <br /> Figure 1 -Location Map <br /> Figure 2 - Site Map <br /> Figure 3 - Vertical Gradient Cross Section C-C' 13 September 2004 <br /> Figure 4 -First Zone Aquifer Ground Water Elevation Map 13 September 2004 <br /> Figure 5 - Second Zone Aquifer Ground Water Elevation Map 13 September 2004 <br /> Figure 6 - Secondary Aquifer Zone Ground Water Elevation Map 13 September 2004 <br /> Figure 7 - Primary Aquifer Zone Ground Water Elevation Map 13 September 2004 <br /> Figure 8 Estimated Extent of First Zone Dissolved MTBE September 2004 <br /> Figure 9 - Estimated Extent of Second Zone Dissolved MTBE September 2004 <br /> Figure 10 -Dissolved MTBE-Impact Cross Section C- C' September 2004 <br /> TABLES <br /> Table 1 -Analytical Results of Pump & Treat Water Samples -Petroleum Constituents <br /> Table 2- Ground Water Elevation Data <br /> Table 3-Analytical Results of Ground Water Monitoring Well Samples - Site Investigation <br /> Table 4-Analytical Results of Ground Water Monitoring Well Samples - 13 & 14 September 2004 <br /> Table 5- Ground Water Pump & Treat Performance Data <br /> Table 6- Summary of Monitoring/Extraction Well Details <br /> APPENDICES <br /> Appendix A - Ground Water Pump & Treat System Operation and Maintenance Field Notes <br /> Appendix B - Ground Water Pump & Treat Analytical Results <br /> Appendix C - Ground Water Pump & Treat Mass-Volume Calculations <br /> Appendix D-Plots of Pump & Treat Mass Removal Trends and Influent MTBE Concentrations vs <br /> Time <br /> Appendix E - Three Bs Truck Plaza Ground Water Monitoring Data - September 2004 <br /> Appendix F - Ground Water Monitoring Well Field Logs - September 2004 <br /> Appendix G-Laboratory Report of Ground Water Monitoring Well Analytical Results-September <br /> 2004 <br /> Appendix H - GeoTracker Transmittal Confirmation <br /> • <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.