My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000667
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000667
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 10:16:01 PM
Creation date
2/15/2019 3:18:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000667
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quarterly Report - First Quarter 2003 <br /> FLAG CITY CHEVRON <br /> 6421 Capitol Avenue, Lodi, California <br /> TABLE OF CONTENTS <br />' LIST OF FIGURES <br /> Figure 1 -Location Map <br />' Figure 2-Site Map <br /> Figure 3 - Vertical Gradient Cross Section GC' 24 March 2003 <br /> Figure 4-First Zone Aquifer Ground Water Elevation Map 24 March 2003 <br />' Figure 5 -Second Zone Aquifer Ground Water Elevation Map 24 March 2003 <br /> Figure 6-Secondary Aquifer Zone Ground Water Elevation Map 24 March 2003 <br /> Figure 7-Primary Aquifer Zone Ground Water Elevation Map 24 March 2003 <br /> Figure 8 Estimated Extent of First Zone Dissolved MTBE 24, 25&26 March 2003 <br />' Figure 9-Estimated Extent of Second Zone Dissolved MTBE 24, 25&26 March 2003 <br /> Figure 10-Dissolved MTBE-Impact Cross Section C- C' March 2003 <br /> Figure 11 -Site Conceptual Model March 2003 <br />' LIST OF TABLES <br /> iTable 1 -Analytical Results of Pump& Treat Water Samples-Petroleum Constituents <br /> Table 2 -General Minerals&Field Measurements of Pump& Treat Water Samples <br /> Table 3 -Analytical Results of Effluent BioAssay Grab Water Samples <br />' Table 4- Ground Water Elevation Data <br /> Table 5 -Analytical Results of Ground Water Monitoring Well Samples-Site Investigation <br /> Table 6-Analytical Results of First Quarter 2003 Water Samples <br /> Table 7-Analytical Results of Domestic and Municipal Ground Water Well Samples <br /> Table 8- Ground Water Pump&Treat Performance Data <br /> Table 9- Well Construction Details <br />' LIST OF APPENDICES <br /> Appendix A- Ground Water Pump& Treat System Operation and Maintenance Field Notes <br />' Appendix B- Ground Water Pump &Treat Analytical Results-Petroleum Constituents <br /> Appendix C-Ground Water Pump&Treat Analytical Results- General Minerals <br /> Appendix D- Ground Water Pump&Treat Mass-Volume Calculations <br /> 1 Appendix B-Plots of Pump& Treat Mass Removal Trends and Influent MTBE Concentrations vs Time <br /> Appendix F- Three B's Truck Plaza Ground Water Monitoring Data-March 2003 <br /> Appendix G- Ground Water Monitoring Well Field Logs-March 2003 <br /> Appendix H-Laboratory Report of Ground Water Monitoring Well Analytical Results-March 2003 <br />' Appendix I-Hydrograph MW-2, MW-6A and MW-6B <br /> • <br />' Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.