i <br /> 15 October 2003 <br /> AGE-NC Project No 96-0232 <br /> Page 2 of 5 <br /> 2.0. SCOPE OF WORK <br /> AGE proposes to drill and sample five additional Geoprobe soil borings on- and off-site to better <br /> assess MTBE-impacted ground water in the area of monitoring well MW-8 <br /> The investigation will consist of the following tasks <br /> • Permitting and pre-field work activities, <br /> • Soil/grab ground water sample collection and analysis, <br /> • Report preparation <br /> Each of these tasks are discussed below in detail <br /> 2 1 PERMITTING AND PRE-FIELD WORK ACTIVITIES <br /> • Applicable drilling pernuts will be submitted to the San Joaquin County Environmental Health <br /> Department(SJCEHD),an encroachment permit will be submitted to the San Joaquin County Public <br /> Works Department for the soil boring located on Banner Avenue As required by SJCEHD <br /> permitting, a health and safety plan will be prepared in accordance with Occupational Safety and <br /> Health Guidance Manual for Hazardous Waste Site Activities (National Institute for Occupational <br /> Safety and Health Administration, U S Coast Guard and U S Environmental Protection Agency, <br /> 1985) Prior to drilling activities, each proposed drilling location will be clearly marked and a utility <br /> clearance obtained through Underground Service Alert <br /> 22 SOIL/GRAB GROUND WATER SAMPLE COLLECTION AND ANALYSIS <br /> Based on MTBE-impacted ground water encountered at monitoring well MW-8A, AGE proposes <br /> advancement of additional soil probe borings in the following locations <br /> Soil boring P-39 will be located approximately 15 to 25 feet north-northwest of monitoring <br /> well MW-4, P-39 is located to assess MTBE-impact to First and Second Water Zone that <br /> may have migrated from the Flag City Chevron UST tank pit <br /> • Soil boring P-40 will be located approximately 45 to 55 feet northwest of monitoring well <br /> MW-4,P-40 is located to assess any potential MTBE-impact to First and Second Water Zone <br /> that may be migrating from the northwest <br /> • Soil boring P-41 will be located less than 5 feet east of monitoring well MW-8, P-41 is <br /> Advanced GeoEnvironmental,Inc <br />