Laserfiche WebLink
1 <br /> 13• July 2001 <br /> AGE-NC Project No 96-0232 <br />' Page 7 of 15 <br />' pounds of extracted MTBE-impacted ground water yields approximately 0 22 pounds of MTBE <br /> removed from MTBE-impacted ground water between 04 June and 02 July 2001(Appendix D) <br />' During the second quarter 2001, an estimated 142 pounds of MTBE was extracted from ground <br /> water,to date,the ground water treatment system has removed a total of approximately 8 76 pounds <br /> of MTBE from extracted ground water(Table 8) Second quarter 2001 mass-volume calculations <br />' of MTBE-impacted ground water extracted from the ground water pump-and-treat system are <br /> presented in Appendix D Plots of cumulative ground water pump and treat mass removal trends and <br /> Iinfluent ground water MTBE concentrations versus time are in Appendix E <br />' 3.0. QUARTERLY GROUND WATER MONITORING AND SAMPLING EVENT <br /> On 13 and 14 June 2001,ground water monitoring and sampling were performed on 30 ground water <br /> monitoring wells (MW-1, MW-2, MW-4, MW-5, MW-6A, MW-6B, MW-7, MW-8A, MW-8B, <br /> MW-8C, MW-9A, MW-9B, MW-9C, MW-10A, MW-1013, MW-10C, MW-IOD, MW-10E, <br /> MW-11A, MW-11B, MW-11C, MW-11D, MW-12A, MW-12B, MW-12C, MW12D, MW-13A, <br /> MW-13B, MW-13C and MW-13D) As-built monitoring well construction details are summarized <br /> in Table 9 <br /> I In addition, ground water samples were collected from 9 extraction wells (EW-2, EW-3, EW-4, <br /> EW-5,EW-6,EW-7,EW-8,EW-9 and EW-10),two domestic drinking water wells located at 14659 <br /> Thornton Road(RDW-1)and at 14749 Thornton Road(DW-1),and two San Joaquin County service <br /> area No 31 municipal water wells (CSA-1 and CSA-2) Quarterly ground water monitoring <br /> procedures for the site were outlined in the Work Plan Addendum, dated 28 January 1998, and <br /> approved by the PHS-EHD by letter dated 24 February 1998 A coordinated effort was made with <br /> Three B's Truck Plaza (14749 Thornton Road, Lodi CA) to conduct ground water monitoring <br /> activities concurrently, the Three B's Truck Plaza tabulated ground water elevation results are in <br />' Appendix F <br /> 3 1 MONITORING WELL PURGE PROCEDURES <br /> I <br /> Depths to ground water were measured in the ground water monitoring wells from the tops of the <br /> well casings to the nearest 0 01-foot utilizing a Solinst water level meter Ground water elevations <br /> in each monitoring well at the site were calculated by subtracting the measured depth to ground <br /> water from the surveyed well casing elevations(Table 4) Ground water elevations were plotted for <br /> I the informal First Zone, Second Zone, Secondary Aquifer Zone and Primary Aquifer Zone <br /> hydrogeologic flow units as defined in Final Remediation Plan,dated 31 August 2000 Ground water <br /> elevation data was contoured on scaled site maps (Figures 3, 4, 5 and 6, respectively) <br /> Advanced GeoEnvironmental,Inc <br />