Laserfiche WebLink
I <br /> 15 January 2002 <br /> AGE-NC Project No 96-0232 <br />' Page 11 of 16 <br />' According to the fourth quarter 2001 update letter,the BFLP is in the process of obtaining an "out- <br /> of-agency" water service for the Rocky's Restaurant At this time, the San Joaquin County Public <br /> Works is reviewing engineering plans (prepared by Dillon&Murphy Engineering) for a permanent <br />' water connection to County Service Area No 31 <br /> The results of pump and treat ground water remediation between 01 October and 31 December 2001 <br />' are as follows <br /> • Approximately 2,043,809 gallons of MTBE-impacted ground water were continuously <br />' extracted from wells EW-4 and EW-5 and selectively extracted from wells EW-2, EW-6, <br /> EW-7, EW-8, EW-9 and EW-10, which are completed in the First Zone aquifer <br />' • A total volume of approximately 9,303,630 gallons of MTBE-impacted water has been <br /> treated at the site since the start-up period in November 2000 <br />' • Dissolved MTBE was detected(utilizing EPA Method 8260M) in water samples collected <br /> from the extraction wells at concentrations between 2 3 and 53 ,ug/l, the greatest MTBE- <br /> impacted water was collected from extraction well EW-4 near the southwest corner of the <br /> liesite <br /> • Dissolved MTBE was detected from grab samples collected at the influent-end of the <br /> treatment system at concentrations between 20 and 23 µg11 <br /> • Laboratory analysis of three grab water samples collected at the effluent-end of the pump and <br /> treat system did not detect any constituents of concern <br />' fl Between 06 September and 15 October 2001, the mass of MTBE-impacted ground water <br /> processed during operation of the pump and treat system was calculated to be 8,220,499 <br />' pounds Multiplying the average MTBE concentration (15 4g/1) by the pounds of MTBE- <br /> extracted water yielded a mass of approximately 0 12 pounds of MTBE removed from the <br /> extracted ground water(Table 8, Appendix D) <br />' Between 15 October and 07 November 2001, the mass of MTBE-impacted ground water <br /> processed during operation of the pump and treat system was calculated to be 3,976,449 <br /> pounds Multiplying the average MTBE concentration (21 5 µg/1)by the pounds of MTBE- <br /> extracted water yielded a mass of approximately 0 08 pounds of MTBE removed from <br /> extracted ground water(Table 8, Appendix D) <br />' Between 07 November and 12 December 2001, the mass of MTBE-impacted ground water <br /> processed during operation of the pump and treat system was calculated to be 6,437,298 <br /> pounds Multiplying the average MTBE concentration (20 µg11) by the pounds of MTBE- <br /> extracted water yielded a mass of approximately 0 13 pounds of MTBE removed from <br /> extracted ground water(Appendix D) <br /> Advanced GeoEnviroumental,Inc <br /> I <br />