My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000693
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000693
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:34:38 PM
Creation date
2/15/2019 4:13:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000693
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 March 2000 <br /> AGE-NC Project No 96-0232 <br /> Page 7 of 8 <br /> 41 PILOT SOIL BORING <br /> One pilot soil boring will be advanced at the site to a maximum depth of 35 feet bsg utilizing a truck- <br /> mounted, hollow-stem drill ng and 10-inch diameter hollow-stem augers Cuttings generated during <br /> drilling activities will be placed on plastic sheeting and covered by plastic sheeting Rinseate will <br /> be containerized in properly labeled DOT-approved 55-gallon drums, and stored on-site in an area <br /> lacking public access Disposal alternatives will be evaluated based on results of soil and water <br /> analysis <br /> 42 WELL COMPLETION <br /> The 10-Inch diameter pilot boring will be single-completed as a ground water extraction well <br /> utilizing 6-Inch diameter schedule 40 polyvinylchlonde {PVC} 0 020-Inch slotted well screen and <br /> blank well casing A 25-foot length of well screen Is anticipated for Installation of the extraction <br /> well A proposed well construction diagram is depicted In Figure 3 <br /> After installing the well casing in each pilot boring, a filter pack material consisting of pre-washed <br /> #3 Lonestar sand will be added through the augers over the screen interval to approximately two feet <br /> above the screened Interval Following placement of the filter pack, the well will be surged to assist <br /> In settling the filter pack Additional sand will be added if settling occurs <br /> A nominal two-foot bentonite seal (pell plug-coded bentonite pellets) will be placed above the filter <br /> pack to minimize the potential for grout penetration into the screened section of the well The <br /> bentonite seal will be formed by pouring bentonite pellets into the annulus and allowing them to <br /> settle on the filter pack The bentonite pellets will be allowed to hydrate for a minimum of one-half <br /> hour prior to grouting <br /> The remaining annular space will be filled to the ground surface with a cement grout The grout <br /> mixture will consist of Type I/II portland neat cement and not more than 6 gallons of water per 94- <br /> pound sack of cement The grout will be placed by pumping through tremmie pipe A grouting <br /> inspection will be scheduled with RWQCB/PHS-EHD personnel <br /> 43 WELL DEVELOPMENT <br /> Development of the proposed well will consist of a combination of bailing with a stainless steel <br /> bailer to remove the mayor portion of fine-grained sediment from inside the well, surging to flush <br /> out or draw in sediment from the filter pack and additional ground water evacuation (purging) with <br /> a submersible pump to finish the removal of fine-grained sediment Developmental purging activities <br /> Advanced GeoEmironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.