Laserfiche WebLink
SIERRA <br /> Clint Rogers Page 5 <br /> March 25, 1991 <br /> Soil samples will be collected from the borings at intervals i greater than 5 ft in steam- <br /> cleaned or new brass tubes in accordance with SES Standard Operating Procedure-Soil Sampling <br /> (Appendix B). SES will attempt to collect a soil sample at the soil/ground water interface. Soil <br /> samples will be collected at intervals of less,than 5 ft if there is a change in soil type or;if <br /> hydrocarbons are detected by field personnel or with the OVM. <br /> The soil samples will be field screened with an OVM in accordance with SES Standard <br /> Operating Procedure - OVM Use (Appendix B). If hydrocarbons are detected with the OVM or by <br /> SES field personnel at the bottom of the proposed boring/well, SES personnel will attempt to <br /> collect sufficient samples to define the vertical extent of hydrocarbons in the boring. <br /> Drill cuttings will be stored on-site in 55-gallon Department,of Transportation (DOT) <br /> approved drums pending analytic results. Each drum will bejsealed and labeled. ; <br /> The soil samples from the borings will be analyzed for TPPH(G) and TPH(D)by EPA Method <br /> 5030/8015 and for BTEX by EPA Method 8020. The soil samples will also be analyzed for total <br /> lead by EPA Method 7420. Soil cuttings from the borings will be analyzed for organic lead by the <br /> Department of Health Services (DHS) LUFT Method in accordance with Class III landfill disposal <br /> requirements. <br /> Task 4 - Well Development, Ground Water Sampling and Analysis <br /> The monitoring wells will be developed no sooner than 48 hours after drilling with a vented <br /> surge block and over pumping or bailing accordance with the SES Standard Operating Procedure- <br /> Well Development (Appendix B). Ground water will be removed from the wells using a <br /> submersible pump or PVC bailers.• Ground water removed from the wells will be temporarily <br /> stored on-site in 551gallon DOT-approved drums. <br /> Ground water samples will be collected from the wells no sooner than 24-hours after <br /> idevelopment in accordance with SES Standard Operating Procedure -Water Sampling (Appendix <br /> B). The evacuated water will be stored on-site in 55-gallon drums. <br />