Laserfiche WebLink
-- ---_ =ENGINEERING-SCIENCE,-INC -=--=--- <br /> Mr <br /> =_--Mr Michael J Tnfurna <br /> July 12, 1993 <br /> Page 2 <br /> The July monthly monitoring visit was conducted on July 3, 1993 Results will be <br /> submitted in a monthly report in August, 1993 in a letter to the San Joaquin County <br /> V <br /> ,,submitted <br /> of Public Health Services dated July 8, 1993, Greyhound proposed a bi- <br /> annual groundwater monitoring/sampling program The less frequent monitoring is <br /> based on the results of five quarters of groundwater sampling and analyses We request <br /> that PHS provide a written response to Greyhound's proposed groundwater monitoring <br /> program as soon as possible In the interim, we will continue monthly groundwater <br /> monitoring at this location. <br /> If you have questions or require any additional information, please call us at (315) <br /> 451-9560 <br /> Sincerely, <br /> ENGINEERING-SCIENCE, INC <br /> i <br /> 1 4r /�VN <br /> David A Nickerson <br /> Project Manager <br /> T David L Chaffin, R G r - <br /> California Registered Geologist <br /> (No 4885) <br /> DLC/DAN/lml <br /> cc* T Portele, GLI, Dallas, TX <br /> Elizabeth Thayer, Regional Water Quality Control Board <br /> Laurie A Cotulla, EHD, Program Manager <br /> 3 <br /> LMLJSY360 2210061 REV 1 <br />