My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000635
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
3500 - Local Oversight Program
>
PR0544166
>
ARCHIVED REPORTS XR0000635
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 7:22:25 PM
Creation date
2/22/2019 2:10:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000635
RECORD_ID
PR0544166
PE
3528
FACILITY_ID
FA0005252
FACILITY_NAME
GREYHOUND LINES INC
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730011
CURRENT_STATUS
02
SITE_LOCATION
121 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 til <br /> MARCH 1996 <br /> QUARTERLY STATUS REPORT (CONTH44UED) <br /> • In August 1994 Greyhound returned to a quarterly sampling program in response to a <br /> g � Y q Y <br /> request from PHS-EHD (letter dated August 12, 1994) The PHS-EHD was concerned <br /> about rising water levels beneath the site and the detection of TPH-D in one of the <br /> groundwater samples collected in June 1994. <br /> The second Supplemental Site Assessment Report was submitted by Greyhound to <br /> PHS-EHD in November 1994. Greyhound has received comments to the Supplemental <br /> Site Assessment Report in a letter dated February 3, 1995. In response, one additional <br /> groundwater_monitonng well_was proposed to define the western limits of the soil and <br /> groundwater contamination. <br /> • Water Level measurements from most recent sampling event <br /> Table 1 provides water level measurements and other physical data obtained during the <br /> March 5, 1996 site visit. Free-product and hydrocarbon sheens were not observed in <br /> any of monitoring wells. <br /> Figure 2 is a site plan that includes water level elevations based on the March 5, 1996 <br /> water level measurements. The water elevations indicate that groundwater was flowing <br /> south under an estimated gradient of 0 004 feet per foot. The groundwater elevations <br /> were not contoured because the elevations measur in the three wells differ by less <br /> than 0 30 feet. <br /> • Water Level measurements from previous monitoring events <br /> Table 1 presents the water level measurements and other physical data obtained during <br /> previous monitoring events Free-product and hydrocarbon sheens were not observed <br /> in any of monitoring wells during these events <br /> • Analytical results from most recent sampling event <br /> Table 2 summarizes the analytical results from the March 1996 quarterly sampling <br /> event. None of the BTEX analytes or TPH-D were detected in the samples. The <br /> laboratory report and chain-of-custody record are provided in Appendix A <br /> • Analytical results from previous sampling events <br /> Table 3 presents a summary of the analytical results from all previous groundwater <br /> sampling events <br /> Table 4 presents a summary of the analytical results from all previous soil sampling <br /> events <br /> PARFSSYROIIVOLI WP1728879108969108969L01 DOC <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.