My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
129
>
2900 - Site Mitigation Program
>
PR0503658
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 4:50:46 PM
Creation date
2/22/2019 2:22:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0503658
PE
2950
FACILITY_ID
FA0005929
FACILITY_NAME
FIORE, FRANK
STREET_NUMBER
129
Direction
E
STREET_NAME
CENTER
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309120
CURRENT_STATUS
02
SITE_LOCATION
129 E CENTER ST
P_LOCATION
04
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHFENVIRO_NMENTAL CONSUL TANTS, IIVC. <br /> Health & Safety Plan <br /> 1.0 HEALTHA.VD SAFETYPLAAI <br /> ' WHF Environmental Consultants, Inc., has adopted the following health and safety <br /> procedures for worlang with organic vapors and liquid contaminants encountered during <br /> drilling and excavation of subsurface soil. The purpose of this program is to provide health <br /> ' and safety precautions for the initial and subsequent site visits until the nature and <br /> magnitude of the contaminants have been defined. <br /> 1 <br /> 1.1 Personnel Responsibilities <br /> All personnel assigned or involved with the remedial investigation or site clean ups <br /> will have an assigned responsibility. The outlined responsibilities will establish <br /> ' standards for personnel protective wear, safety procedures and provide for <br /> emergency actions which could arise during project operations. <br /> 1.2 Project Manager (pM <br /> ' The Project Manager directs all project operations. Project Manager (PM), in <br /> cooperation with the Project Safety Officer (PSO), has the primary responsi-bility <br /> for ensuring that the safety plan is read, signed, and filly understood by all <br /> ' employees and outside persons allowed around or within designated worlang <br /> perimeters of the job site. <br /> In cooperation with the PSO, he is responsible for ensuring that at all times during <br /> project operations, all employees adhere strictly to the Health and Safety Plan. <br /> 1.3 Project Safety Officer (PSO) <br /> ' The PSO shall direct and ensure that all employees comply with the Health and <br /> Safety Plan. The PSO has the primary responsibility for: <br /> 1. Assuring that appropriate personnel protective equipment is available and <br /> properly utilized by all on-site personnel. <br /> 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.