My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
129
>
2900 - Site Mitigation Program
>
PR0503658
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 4:50:46 PM
Creation date
2/22/2019 2:22:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0503658
PE
2950
FACILITY_ID
FA0005929
FACILITY_NAME
FIORE, FRANK
STREET_NUMBER
129
Direction
E
STREET_NAME
CENTER
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309120
CURRENT_STATUS
02
SITE_LOCATION
129 E CENTER ST
P_LOCATION
04
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHFEnvironmental�Dnsultants, Inc. • <br /> Health & Safety Plan <br /> Page. 2 <br /> 1 <br /> ' 2. Assuring that personnel are aware of the provisions of this plan, are <br /> instructed in the work practices necessary to ensure safety, and in planned <br /> procedures for dealing with emergencies. <br /> ' 3. Assuring that personnel are aware of the potential hazards associated with <br /> site operations. <br /> ' 4. Monitoring the safety performance of all personnel to ensure that the <br /> required work practices are employed. <br /> ' 5. Correcting any work practices or conditions that may result in injury or <br /> exposure to hazardous substances. <br /> 1 6. Preparing any accidentiincident reports (see attached Accident Report <br /> Form). <br /> 1.4 Project Employee <br /> ' Project Employees involved in on-site investigations are responsible for: <br /> ' 1. Taking all reasonable precautions to prevent injury to themselves and to <br /> their fellow employees. <br /> ' 2. Implementing Health and Safety Program and reporting to the PSO for any <br /> action deviating from the anticipated conditions described in the Health and <br /> Safety Plan. <br /> 1.5 Special Instructions <br /> It is the responsibility of the Project Manager and the Health and Safety Manager <br /> ' to review the available site information to determine, to what degree the Health <br /> and Safety Plan will be implemented. Each site will be handled on a case-by-case <br /> basis. <br /> 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.