My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
129
>
2900 - Site Mitigation Program
>
PR0503658
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 4:50:46 PM
Creation date
2/22/2019 2:22:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0503658
PE
2950
FACILITY_ID
FA0005929
FACILITY_NAME
FIORE, FRANK
STREET_NUMBER
129
Direction
E
STREET_NAME
CENTER
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309120
CURRENT_STATUS
02
SITE_LOCATION
129 E CENTER ST
P_LOCATION
04
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.WHFEnvironmentWonsultants, Inc. • <br /> Health & Safety Plan <br /> ' Page. 6 <br /> Site work areas entrance and exit routes will be planned and emergency escape <br /> routes delineated by the Project Manager. These routes will be shown to all on-site <br /> personnel by the SSO. <br /> ' Visual contact will be maintained between "pairs" on site with the team rema;mng <br /> in close proximity in order to assist each other in case of emergencies. <br /> In the event that any member of the field crew experiences any adverse effects or <br /> symptom of exposure while on-site, the entire field crew should immediately halt <br /> work and act according to the instructions provided by the PSO. <br /> Wind indicators visible to all on-site personnel will be provided by the Project <br /> ' Manager to indicate possible routes for upwind escape. <br /> ' The discovery of any condition that would suggest the existence of a situation <br /> more hazardous than anticipated, should result in the evacuation of the field team <br /> and re-evaluation of the hazard and the level of protection required. <br /> In the event that an accident occurs, the PSO is to complete an Accident Report <br /> Form for submittal to the Project Manager, Client Project Coordinator, and WHF <br /> Environmental Consultant's office. <br /> ' 3.3 General First Aide Treatment <br /> Eye Irrigate Immediately <br /> Skin Soap was promptly <br /> Inhalation Move to fresh air <br /> Ingestion Get medical attention <br />
The URL can be used to link to this page
Your browser does not support the video tag.