Laserfiche WebLink
THE MARLEY COOLING TOUTER COMPANY <br /> 5800 Foxndge Drive/Mission, Kansas 66202/Telephone.(913)362-1818 <br /> November 4 , 1986 <br /> Ms . Marge Rouch NOV 10 Mb <br /> Dept . of Health Services ENVIROMENTAL HEALTH <br /> Northern California Section PERMIT/SERVICES <br /> Toxic Substances Control Div. <br /> 4410 Power Inn Road <br /> Sacramento , CA 95826 <br /> RE : Progress Report - Stockton Assessment Program . <br /> Dear Marge : <br /> This report is to summarize the activities at the Stockton <br /> facility from October 1 to the present . <br /> 1 . Pond Closure <br /> a . The frame work for the treating plant building <br /> is up . The pipe over the diverting canal levee <br /> is in place . The asphalt has been removed for <br /> the flow equalization basin and the sludge <br /> drying basin . Soil in this area will be sampled <br /> under State guidance to determine the final <br /> disposition of the soil . Further construction <br /> on the basins will be delayed until some direction <br /> or approval is received from the State on the <br /> secondary containment system. <br /> b . Item to begin in next 30 days . <br /> 1 . Curb around North yard . <br /> 2 . Pipe line to diverting canal . <br /> 2 . Phase III - Ground Water Assessment <br /> a . Drilling was started October 15 , 1986 . Some <br /> wells have been completed . All wells should <br /> be completed by November 15 , 1986 . <br /> A MARLEY COMPANY <br />