My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1986
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:40:00 PM
Creation date
2/22/2019 2:26:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1986
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE MARLEY COOLING TOUTER COMPANY <br /> 5800 Foxndge Drive/Mission, Kansas 66202/Telephone.(913)362-1818 <br /> November 4 , 1986 <br /> Ms . Marge Rouch NOV 10 Mb <br /> Dept . of Health Services ENVIROMENTAL HEALTH <br /> Northern California Section PERMIT/SERVICES <br /> Toxic Substances Control Div. <br /> 4410 Power Inn Road <br /> Sacramento , CA 95826 <br /> RE : Progress Report - Stockton Assessment Program . <br /> Dear Marge : <br /> This report is to summarize the activities at the Stockton <br /> facility from October 1 to the present . <br /> 1 . Pond Closure <br /> a . The frame work for the treating plant building <br /> is up . The pipe over the diverting canal levee <br /> is in place . The asphalt has been removed for <br /> the flow equalization basin and the sludge <br /> drying basin . Soil in this area will be sampled <br /> under State guidance to determine the final <br /> disposition of the soil . Further construction <br /> on the basins will be delayed until some direction <br /> or approval is received from the State on the <br /> secondary containment system. <br /> b . Item to begin in next 30 days . <br /> 1 . Curb around North yard . <br /> 2 . Pipe line to diverting canal . <br /> 2 . Phase III - Ground Water Assessment <br /> a . Drilling was started October 15 , 1986 . Some <br /> wells have been completed . All wells should <br /> be completed by November 15 , 1986 . <br /> A MARLEY COMPANY <br />
The URL can be used to link to this page
Your browser does not support the video tag.