Laserfiche WebLink
b . Item to begin in next 30 days . <br /> a . The first sample from the new wells <br /> and the regular quarterly sample from <br /> the existing wells will be taken in <br /> mid November . <br /> 3 . Surface Water Sample - South yard . <br /> a. Attached are the results of the analyses <br /> of the samples of the rain water run-off <br /> taken on September 24 , 1986 . Rainfall had <br /> been approximately . 5 inches . <br /> b . Further activity - Since the results were <br /> not what was expected or desired the test <br /> will be run with the following changes : <br /> 1 . The yard will be swept weekly . <br /> 2 . An additional sample will be taken <br /> to the South of the plant in the <br /> ditch on the east side of Sinclair <br /> (see sketch) . <br /> 3 . The sample at the "A" location will <br /> be split and sent to second lab to <br /> verify results . <br /> 4 . The sample at the "B" location will <br /> be split for Q .A. sample at lab . <br /> 5 . An uncontaminated rain water sample <br /> will be taken. <br /> 4. Monthly Monitor Well Tests . <br /> a. Attached are the results of the October <br /> well monitoring program. The September <br /> results were sent in my letter of <br /> Oct . 16 , 1986 to Marge Rouch. This <br /> concludes the 3 month sample test <br /> outlined in Marge Rouch' s memorandum <br /> dated June 25 , 1986 . The test was <br /> actually run over a 4 month period . <br /> The summary sheet has been updated to <br /> show the month of October . Quarterly <br /> monitoring of wells and lysimeter nests <br /> will continue . <br /> 5 . Lysimeter Tests Results . - <br /> Attached are the results of the quarterly <br /> sampling of the lysimeter nests . <br />