Laserfiche WebLink
F <br /> Chevron <br /> HEA <br /> LrH Chevron <br /> "4fPf*? 18 PM 2: 15 <br /> Chevron U.S.A.Products Company <br /> 2410 Camino Ramon <br /> April 14, 1994 San Ramon,CA 94583 <br /> P0.Box 5004 <br /> San Ramon,CA 94583-0804 <br /> Marketing Department <br /> Ms. Mary Meays Phone 510 842 9500 <br /> San Joaquin County Environmental Health. <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> Re: Chevron Station#9-0557, 139 South Center Street, Stockton CA <br /> Attached work plan for additional soil investigation(GTI,4/12/94) <br /> Dear Ms. Meays: <br /> Attached is a work plan dated April 12, 1994, which was prepared by Chevron's consultant, <br /> Groundwater Technology Inc. (GTI), to describe the proposed locations and installation <br /> procedures of four soil borings at the subject site. The purpose of this additional site investigation <br /> is to better define the extent of soil contamination that was identified during the removal of tanks <br /> and piping in April, 1990. <br /> Chevron is prepared to schedule the field work as soon as work plan approval and permits are <br /> issued by your office. <br /> If you have any questions or comments,I can be reached at(510) 842-8695. <br /> Sincerely, <br /> AA?� <br /> Brett L. Hunter <br /> Environmental Engineer <br /> Site Assessment and Remediation <br /> Attachment <br /> cc: Elizabeth Thayer, Central Valley RWQCB, Sacramento, CA <br /> Tom Portele, Greyhound Lines, Inc., P.O. Box 660362, Dallas, TX 75266-0362 <br /> Rec d,yi <br /> . Re", !able <br />