My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
WORK PLANS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:41:23 PM
Creation date
2/22/2019 2:29:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIT''SoOF STOCKTON <br /> A9# <br /> DEPARTMENT OF PUBLIC WORKS <br /> CITY HALL { � t,, 3 P 1 <br /> 425 N. EL DORADO STREET � <br /> STOCKTON, CA 95202-1997 <br /> January 26, 1998 <br /> Roger Hoffmore <br /> Secor International <br /> 3050 Site Circle <br /> Sacramento, CA 95827 <br /> REVOCABLE PERMIT REQUEST FOR GROUNDWATER MONITORING WELLS: <br /> The permitting process required in the City of Stockton for installation of groundwater <br /> monitoring wells is a two phase process. First, a Revocable Permit must be issued, <br /> wherein the City grants permission to the property owner to install and maintain a private <br /> well within the City's right-of-way. Second, an Encroachment Permit is issued which allows <br /> the actual construction of the well to be carried out in our right-of-way. <br /> In order to issue the Revocable Permit, the City requires the following: <br /> 1. A formal written request for a Revocable Permit in which you acknowledge that you <br /> have read and understand the City's Standard Conditions Applicable to Revocable <br /> Permits. An acceptable application form and copy of the Standard Conditions are <br /> enclosed. <br /> 2. A processing fee payable to the City of Stockton in the amount of$310.00. <br /> 3. A detailed work plan including a sketch showing the location of the proposed well(s). <br /> 4. A Faithful Performance Bond, or other acceptable form of financial security, in an <br /> amount of$500.00 per well will be required. This bond shall remain in effect for as <br /> long as the well remains in the City's right-of-way. <br /> 5. A certificate of insurance naming the City as additional insured. Insurance is <br /> required for the agency obtaining the Revocable Permit and the agency obtaining <br /> the Encroachment Permit. A sample form of the certificate is enclosed. Note the <br /> limits are higher than shown in the Standard Conditions. <br /> "STOCKTON...CALIFORNIA'S SUNRISE SEAPORT" <br />
The URL can be used to link to this page
Your browser does not support the video tag.