My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:09 PM
Creation date
2/22/2019 2:36:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECOVED <br /> ® uk! 1 2 5 2006 <br /> BBL <br /> �A <br /> ENVIRONMENT HEALTH <br /> L va an ARCADIS company PEHMITISERVICES <br /> LTransmitted via Federal Express <br /> LOctober 24,2006 <br /> Ms.Victoria McCartney n w1,0 4 <br /> Environmental Health Specialist <br /> San Joaquin County Environmental Health Department <br /> 204 E. Weber Avenue,Third Floor <br /> LStockton,California 95202 <br /> Re: Revised Work Plan for Monitoring Well Installation <br /> L <br /> Former Chevron Service Station 9-0557 <br /> 139 South Center Street, Stockton,California <br /> BBL Project#: 44640 <br /> LDear Ms. McCartney: <br /> Blasland, Bouck & Lee, Inc., an ARCADIS company (BBL), on behalf of Chevron Environmental <br /> Management Company(Chevron),presents this revised Work Plan for additional groundwater assessment <br /> L at the above-referenced site. This Work Plan replaces the Work Plan for Monitoring Well Installation <br /> prepared by SECOR International Incorporated (SECOR), dated September 24, 2004, previously <br /> r- approved by the San Joaquin County Environmental Health Department(SJCEHD),in a letter to Chevron <br /> l dated July 11,2005 (Attachment 1). <br /> W In a letter to Chevron dated September 25, 2006 (Attachment 1), the SJCEHD requested that the <br /> previously approved Work Plan be implemented prior to October 13, 2006 or a new well permit. <br /> 11,.1 application and permit fee would be required. As stated during the October 5, 2006 telephone <br /> conversation between David Evans of BBL and yourself, due to proposed revisions to the Work Plan, <br /> BBL will be unable to implement the field activities prior to October 13;2006. Upon SJCEHD approval <br /> L of this revised Work Plan an application for new well permit will be submitted. <br /> Work activities described in the 2004 Work Plan included: <br /> 1. The advancement of one cone penetrometer test(CPT)boring. <br /> 2. The completion of one groundwater monitoring well using hollow stem augers. Soil samples to <br /> be collected in 5-foot intervals for logging purposes. <br /> L <br /> BBL proposes to modify the proposed work activities as follows: <br /> 1. To reduce the potential for cross contamination between flow zones,sonic drilling is proposed for <br /> the completion of the deep groundwater monitoring well. Soil samples will be collected <br /> Lcontinuously to total depth for logging purposes. <br /> JAD0006\9-0557_00261022_Work Plan Revision.doc <br /> L 10470 Old Placerville Road•Suite 110•Sacramento,CA 95827 <br /> Tel(916)857-0124•Fax(916)857-1965•www.bbl-inc.com.Offices Nationwide <br /> h —.. - — <br />
The URL can be used to link to this page
Your browser does not support the video tag.