Laserfiche WebLink
L <br /> Ms.Victoria McCartney <br /> October 24,2006 <br /> Page 3 of 3 <br /> Well Development and Sampling <br /> The well will be developed a minimum of 48-hours after completion to remove the fine sediments <br /> entrained within the sand-pack during well installation. Upon completion of well development, a <br /> groundwater sample will be collected and submitted for chemical analysis as detailed in Attachment 2. <br /> Reporting <br /> A report will be prepared to document the site investigation activities performed. This report will include <br /> the following: <br /> • Site conditions and background information; <br /> • A scaled site plan illustrating the groundwater sampling locations and other relevant site features; <br /> • Documentation of groundwater sampling activities performed in connection with the site <br /> assessment; <br /> • Results of the laboratory analyses performed on groundwater samples;and <br /> • Conclusions relevant to the assessment objectives. <br /> If you have any questions or comments regarding the contents of this revised Work Plan, please contact <br /> David Lay by telephone at (315)671-9197 or by electronic mail at dwl@bbl-ine.com or David Evans by <br /> telephone at(916)857-0124 ext.226 or by electronic mail at devans@bbl-ine.com. <br /> Sincerely, <br /> BLASLAND,BOUCK&LEE,INC. <br /> David M. Evans Michael P.Fleischner,P. <br /> Senior Project Manager Principal Engineer QROFESS;n - <br /> �� FFL��.�"c; <br /> Yr! DME/plf <br /> Attachments: G J r <br /> Figure 1 - Site Plan with Proposed Boring Location1? t o <br /> Attachment 1 -Regulatory Correspondence <br /> Attachment 2-Field and Laboratory Procedures �` C i v ; <br /> cc: . Ms. Stephanie Furgal,Chevron Environmental Management Company <br /> Mr.Jim Barton,Regional Water Quality Control Board <br /> r- Greyhound Bus Lines <br /> W <br /> JAD0006\9-0557_00261022_Work Plan Revision.doc <br /> BLASLAND,SOUCK&LEE,INC. <br /> an ARCADIS company <br /> I E <br />