My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:09 PM
Creation date
2/22/2019 2:36:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> Ms.Victoria McCartney <br /> October 24,2006 <br /> Page 3 of 3 <br /> Well Development and Sampling <br /> The well will be developed a minimum of 48-hours after completion to remove the fine sediments <br /> entrained within the sand-pack during well installation. Upon completion of well development, a <br /> groundwater sample will be collected and submitted for chemical analysis as detailed in Attachment 2. <br /> Reporting <br /> A report will be prepared to document the site investigation activities performed. This report will include <br /> the following: <br /> • Site conditions and background information; <br /> • A scaled site plan illustrating the groundwater sampling locations and other relevant site features; <br /> • Documentation of groundwater sampling activities performed in connection with the site <br /> assessment; <br /> • Results of the laboratory analyses performed on groundwater samples;and <br /> • Conclusions relevant to the assessment objectives. <br /> If you have any questions or comments regarding the contents of this revised Work Plan, please contact <br /> David Lay by telephone at (315)671-9197 or by electronic mail at dwl@bbl-ine.com or David Evans by <br /> telephone at(916)857-0124 ext.226 or by electronic mail at devans@bbl-ine.com. <br /> Sincerely, <br /> BLASLAND,BOUCK&LEE,INC. <br /> David M. Evans Michael P.Fleischner,P. <br /> Senior Project Manager Principal Engineer QROFESS;n - <br /> �� FFL��.�"c; <br /> Yr! DME/plf <br /> Attachments: G J r <br /> Figure 1 - Site Plan with Proposed Boring Location1? t o <br /> Attachment 1 -Regulatory Correspondence <br /> Attachment 2-Field and Laboratory Procedures �` C i v ; <br /> cc: . Ms. Stephanie Furgal,Chevron Environmental Management Company <br /> Mr.Jim Barton,Regional Water Quality Control Board <br /> r- Greyhound Bus Lines <br /> W <br /> JAD0006\9-0557_00261022_Work Plan Revision.doc <br /> BLASLAND,SOUCK&LEE,INC. <br /> an ARCADIS company <br /> I E <br />
The URL can be used to link to this page
Your browser does not support the video tag.