Page 3 Cont. <br /> and specifications and the Construction Quality Assurance <br /> (CQA) plan were being copied for distribution to the DHS, <br /> California Central valley Regional Water Quality Control <br /> Board (RWQCB) , San Joaquin Environmental Health Department, <br /> and the U.S. Environmental Protection Agency, Region IX <br /> ( reviewing agencies) . Copies of the above documents were <br /> distributed at the same time to interested pre-qualified <br /> contractors for review and comment. Contractors were informed <br /> that a formal invitation for bid would be issued at a future <br /> date, along with any modifications and addenda. <br /> 6 . "Thirty days prior to commencement of construction, submit <br /> a detailed construction quality assurance plan. " <br /> MCTC response: <br /> A detailed Construction Quality Assurance (CQA) Plan has <br /> been prepared and distributed with the construction plans <br /> and specifications. Modifications required by reviewing <br /> agencies will be incorporated in appropriate addenda for <br /> distribution prior to commencement of construction. <br /> 7 . "Within twenty calendar days after receipt of this letter <br /> and prior to implementation of the closure plan, submit: <br /> a) a detailed Health and Safety Plan which addresses closure <br /> and post-closure operations, b) procedures for handling the <br /> hazardous waste to be stabilized, the type and amount of <br /> stabilization reagent to be used, and methods of mixing, <br /> conveying and emplacing the stabilized waste, c) the detailed <br /> procedures for decontamination of any piping, pumps, etc. , <br /> to be removed, as well as the off-site disposal site name, <br /> location (address) and mileage from Stockton. ( 40 CFR 265 . 112 <br /> ( b) ( 4 ) , 265 . 228 and 22 CCR, 67214 ) . " <br /> MCTC response: <br /> a) A detailed Health and Safety Plan addressing closure <br /> construction activities has been submitted to the <br /> reviewing agencies. <br /> Post-closure sampling and inspection efforts will be <br /> covered by a separate Health and Safety Plan. <br /> b) The construction documents outline general procedures <br /> for handling hazardous wastes and require the selected <br /> contractor to submit a detailed waste stabilization plan <br /> for review and acceptance with the bid. The contractor' s <br /> proposed waste stabilization plan will be submitted to <br /> the reviewing agencies after completion of negotiations <br /> and contract award. <br />