My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:44:10 PM
Creation date
2/22/2019 2:37:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1989
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br /> MEJIAN, Gomm.. <br /> STATE OF CAIIFORNIA--HEALTH AND WELFARE AGENCY FEB 141989 GEORGE DEUK <br /> DEPARTMENT OF HEALTH SERVICES ENVIRONMRITALHEALTH <br /> TOXIC SUBSTANCES CONTROL DIVISION PERMIT I SERVICES `��yji <br /> REGION I '� <br /> 4250 POWER INN ROAD <br /> SACRAMENTO,CA 95826 <br /> (916)739-3145 February 10, 1989 <br /> Certified #P485599455 <br /> Mr. Timothy J. Verhagen, Esq. <br /> The Marley Company <br /> 1900 Shawnee Mission Parkway <br /> Mission Woods, Kansas 66205-2001 <br /> Dear Mr. Verhagen: <br /> REQUEST FOR EXTENSION <br /> The Department of Health Services (Department) , Toxic Substances <br /> Control Division (TSCD) , has reviewed your December 22 , 1988, <br /> request for an extension of the Remedial Investigation Report <br /> (RIR) submittal deadline. <br /> The Department cannot grant your proposed 10 1/2 month Remedial <br /> Action order (RAO) extension for submittal of the RIR. The <br /> length of this extension would create excessive delays in the <br /> remediation of the site. Our concern is further heightened as a <br /> result of the low operational frequency of the extraction and <br /> treatment program currently underway. <br /> As an alternative, the Department will make the following <br /> revisions to the RAO schedule: <br /> 1. Submit a report on all Phase IV work done to date. <br /> Submittal of this report to the Department must be by close <br /> of business on March 1, 1989 . <br /> 2 . Submit a detailed Phase V Workplan by March 1, 1989 . This <br /> Workplan must include the continuous coring of boring 111OX" <br /> and installation of the deep aquifer well (between the High <br /> School and the South Yard) as specified in the Department's <br /> April 29, 1988, approval letter. <br /> 3 . Submit the Feasibility Study (FS) as originally scheduled in <br /> the RAO by July 1, 1989 . The final RIR can be combined with <br /> the FS at this time. Merging these documents will then <br /> allow the Marley Cooling Tower Company (MCTC) to be on <br /> schedule with the RAO. The FS should be started midway <br />
The URL can be used to link to this page
Your browser does not support the video tag.