My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:44:10 PM
Creation date
2/22/2019 2:37:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1989
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�Y r 40 <br /> Mr. Timothy J. Verhagen, Esq. <br /> Page 2 <br /> February 10, 1989 <br /> through the remedial investigation (RI) so that information <br /> needs generated in the FS can be included in the RI <br /> fieldwork. The Department believes it is critical to <br /> finalize the RI/FS this summer so that implementation of <br /> soil and ground water remediation can be completed by the <br /> June 1, 1991, deadline. <br /> I must advise you that if the above dates are not met, the <br /> Department will make a finding of substantial non-compliance with <br /> the RAO and the 1984 Settlement Agreement. <br /> In closing, I would also like to make a few clarifying comments <br /> regarding your December 22 , 1988 , letter. They are: <br /> The effective date of the Remedial Action Order is <br /> March 1, 1988 . <br /> The Department approved the Phase IV Workplan (with <br /> revisions) on April 29, 1988 . <br /> Receipt of the October 14 , 1987 , transmittal was <br /> actually December 17, 1987; see enclosed copy of note <br /> from Mr. Dave Bates. <br /> It was the decision of MCTC not to proceed with field <br /> activities upon receipt of the Department ' s <br /> April 29, 1988, approval letter. <br /> We will be glad to meet with you and your consultant to discuss <br /> the details required in the RI/FS reports. Please contact <br /> Mr. Jim Austreng, Project Manager, at (916) 920-7644, if you wish <br /> to schedule a meeting. <br /> Sincerely, <br /> l � <br /> J <br /> Val F. Siebal <br /> Section Chief <br /> Region 1 <br /> Enclosure <br /> cc: Mr. Gary Reents, Central Valley RWQCB, Sacramento <br /> Mr. Ronald Valinoti, San Joaquin Environmental Health <br /> Mr. Jeff Scott, U. S . EPA, Region IX, San Francisco <br /> Mr. Thomas A. Hickey, P.E. , Black and Veatch, Kansas <br /> Assemblyman Patrick Johnston, San Joaquin County <br />
The URL can be used to link to this page
Your browser does not support the video tag.