My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:44:10 PM
Creation date
2/22/2019 2:37:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1989
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MARLEY COOLING TOWER COMPANY <br /> STOCKTON, CALIFORNIA FACILITY <br /> POND CLOSURE <br /> CONTRACT NO. 5 <br /> ADDENDUM NO. 2 <br /> MAY 4, 1989 <br /> A. SCOPE. This Addendum No. 2 consists of pages AD2-1 through AD2-10, <br /> and covers the following additions and changes to the specifications, <br /> drawings, and construction quality assurance plan for this project. <br /> B. SPECIFICATIONS <br /> 1. INVITATION TO BID <br /> Page I-1. The deadline for receipt of sealed bids indicated in the <br /> first paragraph has been established as 3 p.m. , local time, May 19, <br /> 1989. <br /> 2. BID FORM <br /> Page BF-2. Insert the following at the end of third bulleted item <br /> after ". . .for each work element shall be included. ": <br /> "This information shall form the basis for the Waste <br /> Stabilization Plan to be submitted by the Contractor in <br /> accordance with paragraph 2C-3. " <br /> Page BF-2. Insert the following at the end of the fourth <br /> bulleted item after ". . .location within the Pond.": <br /> "(The Engineer's calculation of in situ material to be <br /> excavated initially from the Pond and North Area is <br /> approximately 8,300 cubic yards. )" <br /> 3. SUPPLEMENTARY CONDITIONS <br /> Page SC-6, Paragraph SC-10. Modify all references to "site <br /> safety supervisor" to read as follows: <br /> "site safety supervisor (Project Safety Officer)". <br /> AD2-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.