My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:44:10 PM
Creation date
2/22/2019 2:37:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1989
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page SC-8, Paragraph SC-18. Eliminate the entire paragraph <br /> entitled INDEMNIFICATION OF OTHERS. Insert the following: "(NOT <br /> USED)". <br /> 4. Section 1C - QUALITY CONTROL <br /> Page 1C-2, Paragraph 1C-2. Revise the Frequency column for "Test <br /> Remaining Soil Layer. . ." to read as follows: <br /> "Berm: 6 composite samples (min.) <br /> Pond Bottom: 4 composite samples (min. ) <br /> North Area: 1 composite sample (min. )" <br /> Page 1C-2, Paragraph 1C-2. Revise the Frequency column for "Test <br /> Barrier Layer. . ." to 1'2 Tests (min.)". <br /> Page 1C-2, Paragraph 1C-2. Insert the following in Paragraph <br /> 1C-2. TESTING SCHEDULE: <br /> Responsible <br /> Item Frequency Party <br /> "Granular 1 Test/1,000 cy/ Contractor" <br /> Layer, gradation material source <br /> Page 1C-3, Paragraph 1C-2. Revise the first listing under the <br /> Item column to read as follows: <br /> "Concrete, compressive strength, slump, and air content" <br /> Page 1C-3, Paragraph 1C-2. Insert the following at the end of <br /> the Frequency column of the TESTING SCHEDULE: <br /> "Perimeter air monitoring stations (3 min.), collect and <br /> analyze daily samples during excavation and stabilization <br /> activities (record wind direction and velocity during each <br /> sampling event). Refer to the Health & Safety Plan for <br /> additional details." <br /> 5. Section 2A - EARTHWORK <br /> Page 2A-1, Paragraph 2A-2. Replace the last subparagraph with <br /> the following: <br /> "Dust control and air quality monitoring during activities <br /> under this contract shall be the responsibility of the <br /> Contractor. Refer to the Health & Safety Plan for specific <br /> requirements." <br /> AD2-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.