Laserfiche WebLink
Page SC-8, Paragraph SC-18. Eliminate the entire paragraph <br /> entitled INDEMNIFICATION OF OTHERS. Insert the following: "(NOT <br /> USED)". <br /> 4. Section 1C - QUALITY CONTROL <br /> Page 1C-2, Paragraph 1C-2. Revise the Frequency column for "Test <br /> Remaining Soil Layer. . ." to read as follows: <br /> "Berm: 6 composite samples (min.) <br /> Pond Bottom: 4 composite samples (min. ) <br /> North Area: 1 composite sample (min. )" <br /> Page 1C-2, Paragraph 1C-2. Revise the Frequency column for "Test <br /> Barrier Layer. . ." to 1'2 Tests (min.)". <br /> Page 1C-2, Paragraph 1C-2. Insert the following in Paragraph <br /> 1C-2. TESTING SCHEDULE: <br /> Responsible <br /> Item Frequency Party <br /> "Granular 1 Test/1,000 cy/ Contractor" <br /> Layer, gradation material source <br /> Page 1C-3, Paragraph 1C-2. Revise the first listing under the <br /> Item column to read as follows: <br /> "Concrete, compressive strength, slump, and air content" <br /> Page 1C-3, Paragraph 1C-2. Insert the following at the end of <br /> the Frequency column of the TESTING SCHEDULE: <br /> "Perimeter air monitoring stations (3 min.), collect and <br /> analyze daily samples during excavation and stabilization <br /> activities (record wind direction and velocity during each <br /> sampling event). Refer to the Health & Safety Plan for <br /> additional details." <br /> 5. Section 2A - EARTHWORK <br /> Page 2A-1, Paragraph 2A-2. Replace the last subparagraph with <br /> the following: <br /> "Dust control and air quality monitoring during activities <br /> under this contract shall be the responsibility of the <br /> Contractor. Refer to the Health & Safety Plan for specific <br /> requirements." <br /> AD2-2 <br />