My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:44:10 PM
Creation date
2/22/2019 2:37:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1989
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change fourth paragraph to read: <br /> "Results of the air sampling will be made available to the Black <br /> & Veatch Project Manager who will be responsible for ensuring the <br /> appropriate air sampling is performed under the direction of a <br /> Certified Industrial Hygienist." <br /> Page 8-9, Section 6.2.2, PERIMETER AIR MONITORING. Change second <br /> paragraph to read as follows: <br /> "Perimeter air samples shall be collected before work begins to <br /> establish a baseline airborne contaminant level. Perimeter air <br /> samples will be collected daily during operations involving the <br /> excavations and stabilization of contaminated soils and sediments <br /> from within the surface impoundment and the north areas. Air <br /> samples will be collected on mixed cellulose ester membrane <br /> filters and will be analyzed for arsenic, chromium, and copper. <br /> Samples for total particulates will be collected on polyvinyl <br /> chloride filters. <br /> Results of the air sampling will be made available to the Black & <br /> Veatch Project Manager who will be responsible for ensuring that <br /> the required perimeter sampling is being performed. " <br /> Page 9, Section 6.2, POTENTIAL PHYSICAL HAZARDS. Add: <br /> o Heat Stress, Refer to Section 9.15. <br /> Page 13. Change last sentence in first paragraph to read: <br /> "Respiratory protection will be required in each restricted work <br /> area until the air monitoring results indicate that the airborne <br /> levels of chromium, arsenic, and copper are below their action <br /> levels." <br /> Change second paragraph to read: <br /> "Personal protective equipment such as gloves, coveralls, or <br /> respirators shall continue to be required wherever there is a <br /> potential for direct contact with suspected contamination. <br /> Changes in the required personal protective equipment will be <br /> based on field observations, the results of air monitoring <br /> conducted in accordance with Section 6.2, and other contributing <br /> factors. If air monitoring results show the airborne co <br /> concentrations of arsenic, chromium, or copper to be more than <br /> ten times above their respective permissible exposure limits then <br /> Level B protection will be implemented by the Project Manager." <br /> Page 18, Section 9.8.2, 3rd Line. Change the word "reduce" to <br /> "minimize,, <br /> AD2-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.