My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1990
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:00:31 PM
Creation date
2/22/2019 2:39:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1990
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> PROPOSED GFAINDWATER MONITORING SCHEDULE <br /> ACTIVITY SAMPLING FREQUENCY <br /> Water Level Measurements. . . . . . . . . . . . . .Quarterly (January, April , July, <br /> October) <br /> Sample CWS Wells. . . . . . . . . . . . . . . . . . . . . .Quarterly (January, April , July, <br /> October) <br /> Sample MSD1 and MSI wells <br /> and Solari Irrigation Well . . . . . . . . . . . .Quarterly (January, April , July, <br /> October) <br /> Sample Newly Constructed <br /> Monitor Wells . . . . . . . . . . . . . . . . . . . . . . . . Quarterly (January, April , July, <br /> October) <br /> Sample all Monitor Wells and <br /> Extraction Well EW-1 . . . . . . . . . . . . . . . . . .Semi-annually (January, July) <br /> Sample Domestic and Irrigation <br /> Wells South of Main Street. . . . . . . . . . . .Semi -annually (January, July) <br /> Notes: <br /> 'Main Street domestic well will be sampled quarterly until <br /> residents receive municipal water. <br /> ZNewly constructed monitor wells will be sampled quarterly for a minimum <br /> of 1 year. <br /> HARGIS+ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.